MS-21 客机draft design完-详细设计即将完成--(TsAGI开 ...

来源:百度文库 编辑:超级军网 时间:2024/04/29 09:03:47


=====================

http://www.irkut.com/ru/news/pre ... /index.php?id48=359

--

MS-21 PROGRAM SUCCESSFULLY HELD THIRD CHECK ABROAD


OAO Irkut Corporation has completed work on the passage of the third turn of the control program of MS-21.

The Commission, comprising representatives of industry, professional institutions, government agencies, approved by the Corporation submitted Irkut materials.

Passage of the third turn of the control provided for:

- Analysis of a business plan and cost-effectiveness of the program;

- An assessment of the market and marketing policies;

- Review and approval of draft design, an evaluation of the technical and technological solutions;

- Analysis of solutions to support the life cycle, the use of information technologies and integrated logistics support.

The Commission also approved the budget and schedule of the next phase of the program MS-21.

Oleg Demchenko said: "Passage of the third turn of the control confirmed the correctness of ideas and solutions specialists Irkut. The program runs according to schedule. Our plans - further expansion of work and actively marketing the aircraft."

Program a family MS-21 - the main promising project UAC, which Irkut Corporation is a prime contractor. The program included in the federal program of civil aviation until 2015

The family includes three airplanes: MS-21-200 (150 seats), MC-21-300 (181 seat), MC-21-400 (212 seats).

On the technical level of MS-21 will surpass the existing airplanes. The introduction of advanced technologies will provide 25 percent improvement in fuel economy, 15 per cent reduction in operating costs, as well as a new level of environmental safety. High technical excellence will be achieved through the introduction of new aerodynamic concept of the wing, increasing the proportion of composite materials, the use of advanced high-efficiency engines and avionics of the new generation.

First flight of the MS-21 is planned for 2014 certification by Russia's standards expected to be completed in 2015, international - in 2016

=====================

http://www.irkut.com/ru/news/pre ... /index.php?id48=359

--

MS-21 PROGRAM SUCCESSFULLY HELD THIRD CHECK ABROAD


OAO Irkut Corporation has completed work on the passage of the third turn of the control program of MS-21.

The Commission, comprising representatives of industry, professional institutions, government agencies, approved by the Corporation submitted Irkut materials.

Passage of the third turn of the control provided for:

- Analysis of a business plan and cost-effectiveness of the program;

- An assessment of the market and marketing policies;

- Review and approval of draft design, an evaluation of the technical and technological solutions;

- Analysis of solutions to support the life cycle, the use of information technologies and integrated logistics support.

The Commission also approved the budget and schedule of the next phase of the program MS-21.

Oleg Demchenko said: "Passage of the third turn of the control confirmed the correctness of ideas and solutions specialists Irkut. The program runs according to schedule. Our plans - further expansion of work and actively marketing the aircraft."

Program a family MS-21 - the main promising project UAC, which Irkut Corporation is a prime contractor. The program included in the federal program of civil aviation until 2015

The family includes three airplanes: MS-21-200 (150 seats), MC-21-300 (181 seat), MC-21-400 (212 seats).

On the technical level of MS-21 will surpass the existing airplanes. The introduction of advanced technologies will provide 25 percent improvement in fuel economy, 15 per cent reduction in operating costs, as well as a new level of environmental safety. High technical excellence will be achieved through the introduction of new aerodynamic concept of the wing, increasing the proportion of composite materials, the use of advanced high-efficiency engines and avionics of the new generation.

First flight of the MS-21 is planned for 2014 certification by Russia's standards expected to be completed in 2015, international - in 2016
和919一起?
毛子宣传员。。新年快乐哈。。
langge945 发表于 2010-2-13 22:52

代表我向你全家致以问候啊
无图无真相
找啊,可惜贴不上
JSTCVW09CD 发表于 2010-2-13 22:59


    问候你祖宗18代

问候你祖宗18代
huyue0013 发表于 2010-2-23 22:21


过年回去应该祭奠祖先了吧?   应该都问候过他们了。

看看他们是否允许你问候别人的祖先?

叩头也得找对地方是吧。
问候你祖宗18代
huyue0013 发表于 2010-2-23 22:21


过年回去应该祭奠祖先了吧?   应该都问候过他们了。

看看他们是否允许你问候别人的祖先?

叩头也得找对地方是吧。
大哥原来在啊?
huyue0013 发表于 2010-2-23 22:21

你过分了吧?
这几天鸟文看多了,兰州翻译个大意吧。
MS-21-200对上A319和737-700
MS-21-300对上A320和737-800
MS-21-400对上A321和&37-900ER
看成MIG-21的飘过.....
================

10副MS-21的复合材料机翼已经于2011年4月运抵TsAGI, 现在已经开始强度试验了。

==
1111.jpg
JSTCVW09CD 发表于 2011-6-7 13:09
================

10副MS-21的复合材料机翼已经于2011年4月运抵TsAGI, 现在已经开始强度试验了。
比c919进度快啊,自用为主,外带一点亚非拉,老苏盟。
lz有图米?
JSTCVW09CD 发表于 2011-6-7 13:09
================

10副MS-21的复合材料机翼已经于2011年4月运抵TsAGI, 现在已经开始强度试验了。
十副啊…………
雨后无彩虹 发表于 2011-6-7 14:02
十副啊…………
不多, 很多测试项目滴...........
LZ给图!
MC21的复合材料使用率能占到空重的多少?能达到T50的25%不能
JSTCVW09CD 发表于 2011-6-7 15:08
不多, 很多测试项目滴...........
问下现在怎么搜帖子,按名字搜帖子,改版后不知道怎么办
涡轮 发表于 2011-6-7 16:38
MC21的复合材料使用率能占到空重的多少?能达到T50的25%不能
30%以上, 不到50%.........
其实毛子的底子还是有的
TG要紧追了~~~~
胸怀大度点,你不能允许人家不设计同类飞机啥
JSTCVW09CD 发表于 2011-6-8 19:35
30%以上, 不到50%.........
30也不错了,波音787也才50,毛子达到30已经超过我预计的了
不看好
涡轮 发表于 2011-6-8 23:47
30也不错了,波音787也才50,毛子达到30已经超过我预计的了
不超过50%, 这个是确定的。
涡轮 发表于 2011-6-7 16:38
MC21的复合材料使用率能占到空重的多少?能达到T50的25%不能
为何民机的复材比例更大?
SSJ100 发表于 2011-6-9 09:00
为何民机的复材比例更大?
具体不清楚,军用的要求更严格吧
涡轮 发表于 2011-6-7 16:38
MC21的复合材料使用率能占到空重的多少?能达到T50的25%不能
T50复合材料全机重量不少于40%,

              蒙皮面积70%
怎么到你嘴里就变成25%了。
赤道几内亚 发表于 2011-6-10 00:16
T50复合材料全机重量不少于40%,

              蒙皮面积70%
空重25%是总师达维登科给的数据你的40是谁说的