武汉正在建造3艘两栖攻击舰?

来源:百度文库 编辑:超级军网 时间:2024/04/28 06:18:28
State-owned China Shipbuilding Industry Corp (CSIC) has begun fabricating the first Type 071 landing platform dock (LPD) and Type 81 helicopter landing deck (LHD) at its shipyards located at Dalian , Shanghai and Wuhan . Both these vessel types were designed since 1995 by the PLA Navy's Shanghai Research Institute with help from Navantia of Spain. Present plans call for Dalian Shipyard to build six LPDs and Wuhan Shipyard to build three LHDs. Smaller work packages are being executed by the state-owned China State Shipbuilding Corp's (CSSC) Hudong-Zhonghua Shipbuilding Group Co Ltd and Jiangnan Shipyard. The Type 071 LPD will have an overall length of 150 metres, waterline length of 140 metres, moulded beam width of 30 metres, waterline breadth of 24.5 metres, moulded depth of 20 metres, draught of 5.9 metres, full displacement of 14,000 tonnes, cruising speeds of up to 20 Knots, range of 6,000nm at 18 Knots, endurance of 60 days, a crew complement comprising 30 officers and 145 other ranks, a helicopter deck housing two medium-lift helicopters, a four-metre wide 308-lane metre vehicle garage, a flight deck measuring 50 metres by 30 metres, 450 square-metre hospital deck, a hangar measuring 18.5 metres by 23 metres by 8 metres, and a dry dock measuring 40.4 metres by 15.4 metres by 8 metres. The LPD will operate continuously for a minimum of 140 weeks between refits, and each refit period will not exceed 50 weeks. The vessel will be capable of transporting 800 fully equipped troops along with related tracked/wheeled vehicles, or six medium-lift helicopters and assault hovercraft in times of conflict for a period of 14 days. Alternatively, the vessel will carry 400 troops, a 50-tonne main battle tank, one hovercraft, four LCMs, four LCVPs, and up to four medium-lift helicopters. For the PLA Navy, CSIC plans to finish construction of the first Type 071 LPD within 45 months of contract signature. For export customers CSIC will take three months to complete initial design work, followed by six months of technical design activity, eight months for construction design, seven months for construction preparation, 12 months for hull construction and installation of machinery, a one-month period for launching the vessel, five months for vessel outfitting alongside in the shipyard, two months of harbour and sea trials, and less than a month for finalising the delivery process. The LPD's integrated CODAD propulsion, controlled by an automated propulsion control system, will comprise twin MTU 20V956TB92 diesel engines each rated at 8,840hp (6.5mW) and twin gas turbines procured from Ukraine 's Zorya Mashproekt Scientific & Production Enterprise. The on-board weapon systems suite will include twin seven-barrel 30mm Type 730 CIWS aft of the funnels and above the helicopter deck facing portside and starboard, twin 12.7mm and 30mm guns, plus a total of 24 vertically-launched HHQ-9 medium-range, semi-active radar-guided SAMs (built by China State Precision Machinery Import-Export Corp) carried in and launched from four six-cell vertical launchers. The LPD will also be equipped with a water-cooled active phased-array multi-role radar (with four antennae) co-developed by the Leihua Electronic Technology Research Institute (LETRI, or 607 th Institute), Nanjing Research Institute of Electronic Technology (also known as NRIET, or the 14 th Institute), and Ukraine 's Kvant-Radiolokatsiya company. The vessel's bridge will be equipped with an integrated platform management system while the combat information centre, to be supplied by the state-owned China Electronics Trading Corp International (CETC), will be located behind the bridge in a hardened citadel and will be configured to also function as a joint operations command-and-control station, deck and aviation control centre, and a vehicles and troop movements control centreState-owned China Shipbuilding Industry Corp (CSIC) has begun fabricating the first Type 071 landing platform dock (LPD) and Type 81 helicopter landing deck (LHD) at its shipyards located at Dalian , Shanghai and Wuhan . Both these vessel types were designed since 1995 by the PLA Navy's Shanghai Research Institute with help from Navantia of Spain. Present plans call for Dalian Shipyard to build six LPDs and Wuhan Shipyard to build three LHDs. Smaller work packages are being executed by the state-owned China State Shipbuilding Corp's (CSSC) Hudong-Zhonghua Shipbuilding Group Co Ltd and Jiangnan Shipyard. The Type 071 LPD will have an overall length of 150 metres, waterline length of 140 metres, moulded beam width of 30 metres, waterline breadth of 24.5 metres, moulded depth of 20 metres, draught of 5.9 metres, full displacement of 14,000 tonnes, cruising speeds of up to 20 Knots, range of 6,000nm at 18 Knots, endurance of 60 days, a crew complement comprising 30 officers and 145 other ranks, a helicopter deck housing two medium-lift helicopters, a four-metre wide 308-lane metre vehicle garage, a flight deck measuring 50 metres by 30 metres, 450 square-metre hospital deck, a hangar measuring 18.5 metres by 23 metres by 8 metres, and a dry dock measuring 40.4 metres by 15.4 metres by 8 metres. The LPD will operate continuously for a minimum of 140 weeks between refits, and each refit period will not exceed 50 weeks. The vessel will be capable of transporting 800 fully equipped troops along with related tracked/wheeled vehicles, or six medium-lift helicopters and assault hovercraft in times of conflict for a period of 14 days. Alternatively, the vessel will carry 400 troops, a 50-tonne main battle tank, one hovercraft, four LCMs, four LCVPs, and up to four medium-lift helicopters. For the PLA Navy, CSIC plans to finish construction of the first Type 071 LPD within 45 months of contract signature. For export customers CSIC will take three months to complete initial design work, followed by six months of technical design activity, eight months for construction design, seven months for construction preparation, 12 months for hull construction and installation of machinery, a one-month period for launching the vessel, five months for vessel outfitting alongside in the shipyard, two months of harbour and sea trials, and less than a month for finalising the delivery process. The LPD's integrated CODAD propulsion, controlled by an automated propulsion control system, will comprise twin MTU 20V956TB92 diesel engines each rated at 8,840hp (6.5mW) and twin gas turbines procured from Ukraine 's Zorya Mashproekt Scientific & Production Enterprise. The on-board weapon systems suite will include twin seven-barrel 30mm Type 730 CIWS aft of the funnels and above the helicopter deck facing portside and starboard, twin 12.7mm and 30mm guns, plus a total of 24 vertically-launched HHQ-9 medium-range, semi-active radar-guided SAMs (built by China State Precision Machinery Import-Export Corp) carried in and launched from four six-cell vertical launchers. The LPD will also be equipped with a water-cooled active phased-array multi-role radar (with four antennae) co-developed by the Leihua Electronic Technology Research Institute (LETRI, or 607 th Institute), Nanjing Research Institute of Electronic Technology (also known as NRIET, or the 14 th Institute), and Ukraine 's Kvant-Radiolokatsiya company. The vessel's bridge will be equipped with an integrated platform management system while the combat information centre, to be supplied by the state-owned China Electronics Trading Corp International (CETC), will be located behind the bridge in a hardened citadel and will be configured to also function as a joint operations command-and-control station, deck and aviation control centre, and a vehicles and troop movements control centre
印度某军事杂志上说的
有武汉的朋友能证实下吗?
072III大登吧。
我估计应该是大登

目前来看  只有大连才有这个能力造两栖
可能性不大吧!胡主席没告诉我啊!~~;P
大登也要多造,现在也不够。
除了上海、大连。我想广州也具有这个实力吧。
如果武汉开始建造大登了,是不是说明沿海的几个大厂有其他更大的任务了???
Dalian Shipyard to build six LPDs and Wuhan Shipyard to build three LHDs

造的不少呀,规格都很说细,是真的吗?

full displacement of 14,000 tonnes,
胡说八道。。。
有3种?拭目以待。
唉,六级的阅读材料
:D :D
持怀疑态度。。。:o
这么详细的数据从那里来的呀, 说的非常明确, 是得到了内部材料?
武汉只能造大登吧:L
楼上文章的出处是?
过6级的给翻译一下啊!
最新的相控阵不大可能装登陆舰上,世界上没先例啊
再说了,有多余的相控阵,还不如装新建的驱逐舰上去,护卫舰也行啊
好象很详细,难保我们的保密工作没有做到家。
The on-board weapon systems suite will include twin seven-barrel 30mm Type 730 CIWS aft of the funnels and above the helicopter deck facing portside and starboard, twin 12.7mm and 30mm guns, plus a total of 24 vertically-launched HHQ-9 medium-range, semi-active radar-guided SAMs (built by China State Precision Machinery Import-Export Corp)
-----------------------------------------------------
071上装的是630不是730。还有071上要装24单元的HHQ-9??
:L :L :L
我一直感觉大连会有猛料~~~
武汉哪来的两攻啊,只有072大登啦.:D
国营中国造船工业公司(CSIC)分别在大连、上海和武汉的造船厂开始制造首艘071型船坞登陆舰(LPD)和81型(直升机/船坞)两栖登陆舰(LHD)。这两型登陆舰自1995年开始,由中国人民解放军海军上海研究所在西班牙巴赞造船厂的帮助下进行设计。在当前的造船计划中,大连造船厂将制造6艘LPD,武汉造船厂制造3艘LHD。国营沪东中华造船集团有限公司(CSSC)目前正在执行一些规模较小的制造计划。071型LPD全长150米,水线长度140米,船模宽度30米,水线宽度24.5米,船模高度20米,干舷高5.9米,满排14,000吨,最大巡航速度20节,18节航程6000海里,自持力60天,全船编制包括有30名军官和145名其他各级军人,直升机甲板能停放两架中型直升机,带4米宽度308型窄体车库,飞行甲板尺寸为50米X30米,机库尺寸为18.5米X23米X8米,干船坞尺寸40.4米X15.4米X8米。LPD在两次大修期期间至少能持续运转140个星期,且每次大修期不超过50个礼拜。该型船能运载800名全副武装状态的步兵和履带/轮式车辆,或者6架中型直升机和气垫船,参与为期14天的冲突。另一种运载方案为400名步兵,一辆50吨级主战坦克,一艘气垫船,4艘LCM,4艘LCVP,还有最多4架中型直升机。CSIC的计划在45个月的合同期中为人民解放军海军完成首搜071型LPD的建造。对于出口顾客,CSIC将花费3个月完成初始设计,随后进行6个月的详细技术设计,8个月的建造设计,7个月的建造准备时间,12个月的船体结构建造和设备安装。船舶下水为期1个月,船厂栖装5个月,2个月的船厂检测和海试,还有至少1个月的交船期。LPD采用了CODAD推进方式,全自动推进控制系统,主机为两台8,840马力MTU20V956TB92柴油机和两台乌克兰Zorya Mashproekt科学与生产联合体生产的燃气轮机。武器系统包括有两门船尾烟囱部位布置的730型7管30毫米CIWS,在直升机甲板上方两舷布置有双12.7毫米机枪和30毫米机炮,另外还有总计4个6单元垂直发射器中发射的 24发HHQ9中程半主动雷达制导面空导弹(中国国营精密仪器进出口公司)。LPD同时装备了雷华电子技术研究所(LETRI或者607研究所)和南京电子技术研究所(NRIET或者14所)以及乌克兰Kvan-Radiolokatsiy公司共同开发的水冷主动相控阵多目标雷达(四天线)。船桥将装备集成管理平台,其中,国营中国电子贸易公司(CETC)提供的战斗信息中心位于船桥之后加固的堡垒之中,战斗中心可以配置为联合指挥与控制站,船坞与飞行控制中心,还有车辆与部队运动控制中心。
好象和实际的有点不同,尤其是那近防炮
印度人自己YY不够,还要帮我们YY,晕。。。
你们知不知道在珠海航展上我国要露出新概念航母这种航母是接替谁的好好想想把
大东西现在只有上海,大连造的出。
问题是在武汉那种地方造出来也开不出来!!
打死也不信阿三的小道消息。
继续观望啊:)
胡说八道一派胡言:@
2000多吨的也叫WD
不要相信那个
要造也得有实力的
那么多有实力的没造它能造不觉得在犯错误
天方夜谭
老外的情报机构也不是吃素的,中国在搞什么东西我想老外大部分很清楚,基本性能也摸个八九不离十,主要是关系到作战的战技指标一定要保密
这帮人知道武船在什么地方么?
那么大的船造出来怎么过武汉、南京两座长江大桥?