印度HAL Tejas光辉战斗机再度推迟预期定型时间至2014年

来源:百度文库 编辑:超级军网 时间:2024/04/29 23:50:26


http://goo.gl/p3zgE
http://livefist.blogspot.com/2011/11/troubles-slow-tejas-again.html?utm_source=twitterfeed&utm_medium=twitter



The photo above, taken at the National Aerospace Laboratory's wind-tunnel, shows testing this year of a Tejas model with various stores configurations. With LCA Tejas final operational clearance slipping to 2014, and the programme still struggling to meet performance specs for the second phase of initial operational clearance (IOC-2), the aircraft project has dipped into another difficult phase. According to sources, several requirements (that were watered down during IOC-1 in January), are still to be met. The parameters include wake penetration certification, all weather clearance (ironically, tests were stalled because of the monsoon earlier this year) and lightning clearance. Earlier this month, IAF chief Air Chief Marshal NAK Browne said again that final operational clearance was delayed by a full year -- moving down to 2014. Meanwhile, the first prototype of the LCA-Navy is preparing for a first flight -- hopefully before New Year.

译文:……。光辉战斗机的最终运作许可定型(FOC)已经被推迟至2014年,甚至此开发项目在达到初始运作许可定型-2(IOC-2,唉,搞不定IOC又不好意思说,就说搞定了IOC-1,现在要搞的是IOC-2,这种转进的智慧实在是大能)中也步履维艰。飞机的开发陷入了另外一个艰困时期。尽管IOC-2的指标已经是在既定的今年1月IOC指标上灌水打折扣,但据消息来源称仍然有数个指标未能达标,包括飞机航迹穿越认证,全天候飞行许可以及照明系统许可。本月较早前,印度空军四星上将Browne称最终运作定型被推迟一整年至2014年。与此同时,第一架海军型光辉战机正在为可能在新年前的首飞做准备。

看看人家小巴飞JF-17飞得多欢……这真没法比
人家小巴MBT-2000也撒欢多少年了,Arjun坦克还在蜗牛速度。

http://goo.gl/p3zgE
http://livefist.blogspot.com/2011/11/troubles-slow-tejas-again.html?utm_source=twitterfeed&utm_medium=twitter

tejas.jpg (74.87 KB, 下载次数: 1)

下载附件 保存到相册

2011-12-4 00:47 上传



The photo above, taken at the National Aerospace Laboratory's wind-tunnel, shows testing this year of a Tejas model with various stores configurations. With LCA Tejas final operational clearance slipping to 2014, and the programme still struggling to meet performance specs for the second phase of initial operational clearance (IOC-2), the aircraft project has dipped into another difficult phase. According to sources, several requirements (that were watered down during IOC-1 in January), are still to be met. The parameters include wake penetration certification, all weather clearance (ironically, tests were stalled because of the monsoon earlier this year) and lightning clearance. Earlier this month, IAF chief Air Chief Marshal NAK Browne said again that final operational clearance was delayed by a full year -- moving down to 2014. Meanwhile, the first prototype of the LCA-Navy is preparing for a first flight -- hopefully before New Year.

译文:……。光辉战斗机的最终运作许可定型(FOC)已经被推迟至2014年,甚至此开发项目在达到初始运作许可定型-2(IOC-2,唉,搞不定IOC又不好意思说,就说搞定了IOC-1,现在要搞的是IOC-2,这种转进的智慧实在是大能)中也步履维艰。飞机的开发陷入了另外一个艰困时期。尽管IOC-2的指标已经是在既定的今年1月IOC指标上灌水打折扣,但据消息来源称仍然有数个指标未能达标,包括飞机航迹穿越认证,全天候飞行许可以及照明系统许可。本月较早前,印度空军四星上将Browne称最终运作定型被推迟一整年至2014年。与此同时,第一架海军型光辉战机正在为可能在新年前的首飞做准备。

看看人家小巴飞JF-17飞得多欢……这真没法比
人家小巴MBT-2000也撒欢多少年了,Arjun坦克还在蜗牛速度。
那么快~叫我情何以堪
一个崭新的六代机即将将将将将诞生!
英文看不懂就算了,连中文看得都很费劲…
再推迟几十次   也能理解!
有声有色的大国
这算不算是刚定型就该直接拖进空博展览的典型?
有声有色的大国
一点也不意外,估计还会再推
keywords:
slipping to
delayed
moving down to
hopefully
哇,一种崭新的飞机“将”诞生
将来和J20一块翱翔吧
哇,一种崭新的化石飞机“将”诞生
我怎么看出了法国幻影系列的影子  ?
我在想啊,最后会不会搞的j20都比他快..
未来是属于三哥的!!!
LCA、阿琼、“歼敌者”是三哥的三件宝。
百年工程,世纪战机
三哥果然V5!  终将发展成第八代混合动力战机。  我推荐神油+恒河水混合动力
打的过奸7吗?
国际综艺嘉年华
还是去参加航模展吧,有市场。
想起了IDF,从歼7VS到舰20.
世界战机史的奇葩
2014?不要再变了
三角翼,幻影2000的水平?
也可能和IDF差不多!
前进吧三哥,22世纪是LCA的最后目标
可怜的…
三哥要加把劲呀
造飞机?他们的风洞不知道弄好了没?
天外飘 发表于 2011-12-4 07:55
也可能和IDF差不多!
IDF比这货好太多了

2014, 再拖下去, MIG-21摔的再快点, 就接不上趟了
呵呵……准备接受恒河水的洗礼吧
三锅,不意外
超级逛逛晃晃 发表于 2011-12-4 08:36
IDF比这货好太多了

2014, 再拖下去, MIG-21摔的再快点, 就接不上趟了
没事 三锅可以从万国公司再采购几架玩玩
clandkid 发表于 2011-12-4 08:53
没事 三锅可以从万国公司再采购几架玩玩
不多了, 不经他们摔的. 还是快上LCA接着摔吧
LCA会像歼12一样么?

哎~,歼12一年就造出来了,LCA呢???
超级逛逛晃晃 发表于 2011-12-4 08:55
不多了, 不经他们摔的. 还是快上LCA接着摔吧
有时候真羡慕三锅可以随意从万国公司拉货 小兔子就悲剧了 各种禁止 真苦B
fw190a6 发表于 2011-12-4 01:50
哇,一种崭新的化石飞机“将”诞生
LCA上用的好东西不少。。。。。可就是用这么些好东西堆砌出来的东西,仅达到货架产品枭龙水平。。。
等到造出来估摸着也就是二代机的档次,三哥的计划,乃懂得