新年回顾数据统计总结帖: 最近几年俄罗斯海军已建和在 ...

来源:百度文库 编辑:超级军网 时间:2024/04/29 13:00:21


======================
"Construction and built ships and submarines of the Navy of Russia:

in recent years:

Pr. 20380 Steregushchy Russia, 2008 Corvette --- 2 constructed 2 constructed
Pr. 22460 "Rubin" Russia in 2009 PSKR --- 1 built
Pr. 22350 "Admiral Gorshkov" Russia in 2011 Frigate --- 2 constructed
Pr. 21630 "Brawler" Russia 2007 MAC --- 1 built in 2006, 2 under construction
Pr. 20370 Russia, 2001 Boat Relations --- 4 constructed
Pr. 20180 "asterisk" Russia, 2007 PTS --- 1 in 2007 1 in the series will be constructed 5.6 pc. minimum, (the need for more than 10).
Pr. 20120 Russia, 2008 Experimental submarine 1 has SF - B-90 "Sarov"
Pr. 18280 Russia, 2004 Ship Communications 1 built Admiral Yuri Ivanov, 1 in the building. CERs, ie scout
Pr. 11711 Ivan Gren "Russia, 2012 BDK 1 is constructed in term BaltF 5
Pr. 16810 Russia, 2007 Deep apparatus 2 constructed "Rus" and "The Consul"
Pr. 14230 "Sokzhoy" Russia, 2002 PC 2 built
Pr. 1244.1 Thunder Russia, in 2009 MRS 1 in 2009 now "Borodino", a training ship, installed SAM polyment "(?)
Pr. 1431 "Mirage" Russia, 2001 PC 3 BB - 2, KF - 1.
Pr. 1166.1 Gepard, Russia, 2001 MIC 2 built Tatarstan and Dagestan "Series - 10.
Pr. 1244.1 Thunder Russia, 2011 Frigate 1 to 2011
Pr. 266,8 "Agat" Russia, 2007 MT 1 constructed BF (= pr.02268 "Adm. Zakhar'in" put on the Black Sea Fleet)
Pr. 10410 / 2 "Firefly" USSR, 1987 PC 1 is constructed
Pr. 955 / A "Northwind" / "Killer Whale" Russia, 2007 SSBNs 1 has 3 built, is preparing to bookmark 1
Pr. 885 "Ash" Russia, 2010 PLARK 1 is already nearly built. 1 is constructed. It is planned to tab 1 more during the year.
Pr. 677 "Lada" Russia, 2010 DPLT 1 built. 3 we construct.
Pr. 10830 "gate" Russia, 2003 ACS 1 built

Planned to built:
Pr. 677 "Lada" Russia, 2010 DPLT 3 we construct 4 to 2015 by the construction of 20-25 so far.
Pr.636M may still lay the pieces 6. (BSH)
Pr. 955 / A "Northwind" / "Killer Whale" Russia, 2007 SSBNs 1 3 laid the building is planned from 5 to 8
Pr. 885 "Ash" Russia, 2010 PLARK 1 is constructed, 1 laid the planned construction of at least 10
Add another 15 new pieces MTSAPL. (BSH)
Pr. 20180 "asterisk" Russia, 2007 PTS 1 in 2007 1 is built of 5-6 per term (the need for more than 10 pieces)
20380 "Pr. Steregushchy Russia, 2008 Corvette 1 4 laid by the construction of 20 (40 - BS)
Pr. 21630 "Brawler" Russia, in 2007 IAC 1 in 2006 2 built KF
Construction is planned from 5 to 7-15 to 2020
Pr. 22350 "Admiral Gorshkov Russia, 2011 Frigate 1 constructed 1 laid by the construction of 20
Completed BSH:
Destroyers pr.HHH - planned 10/12
UDC ... etc.



Supplement to the list.


For the Navy RUSSIA still under construction:
* Basic trawler Project 12700 "Alexandrite". Currently under construction two ships that proekta.Prim .- minesweepers-seekers mines, rather than the usual MT

* Small landing craft air cavity of the project 21820 "Dugong".
Currently under construction, one ship of this project, announced an order up to ten "dugong."

* Ship communications project 18280. Currently being built one ship of the project, announced an order for a total of two ships of the project 18280.

* Salvage ship project 21300S. At present, construction of one vessel type, announced an order for a total of four vessels project 21300S.

* Rescue ship "Igor Belousov"
Construct JSC "Admiralty Shipyards". Incorporated December 24, 2005. Delivery of the Navy announced in 2011.

* Naval Weapons Project 21130 "Diskant. Currently under construction, one ship of this project. Laid down in 2008 renting in 2011.

* Naval Weapons (search-and-transport ship) project 20180. Currently under construction, one ship of this project.

* The vessel loader project 20360 "Dubnyak. Currently being built one ship of the project, announced the order of the two "Dubnyak.

* Opytovoe ship project 11982. Currently built single vessel. Seliger incorporated July 8, 2009. Delivery of the Navy announced in 2011.

* Marine rescue tug project 22030. Currently being built one ship of the project, announced the order of three tugs. Delivery of the first - in 2011.

* Marine rescue tug draft 745MB "Walrus". currently being built two ships of this project (in the modification of 745MB), announced an order for a total of four "walrus.

* A small survey vessel Project 19910. The parent vessel ( "Vaigach") joined the fleet in 2008. Currently being built one vessel of this type, announced an order for a total of four vessels of the project 19910.

* Large hydrographic boat of 19920 (19920B). The head-cutter of the project BGK-2090 joined the Navy in 2008. Currently under construction a boat of this type.

* Raid lift project 90600. Since 2003, built 18 tugs Project 90600 (including one for the Navy of Russia). Currently under construction 2 vessels of the project, announced by order of RF Navy a total of five tugs.

* Also ordered:

OAO "Baltic Shipyard" Yantar "(Kaliningrad) agor project 22010 2013
OAO "East Wharf" (Vladivostok) landing craft in 2011
"Okskaya Shipyard (Navashino, Nizhny Novgorod Region). The vessel loader project 20360 2010
Khabarovsk Shipbuilding Plant "Two sea rescue tug project 22030 2011 year
OAO Zelenodolsk Plant. Gorky (Zelenodolsk, Tatarstan), two sea rescue tug draft 745MB 2010 and 2011
Astrakhan shipyard raid lift project 705B in 2011
JSC "Leningrad Shipyard" Pella "" Two harbor tugs Project 90600 2010 and 2011
JSC Sokol'skaya Shipyard "(p. Sokol, Nizhni Novgorod reg.) Raid boat of 1388NZ 2010
OJSC "Shipbuilding Plant. October Revolution" (Blagoveshchensk, Amur region.) Two self-propelled barges 2009 and 2010
35 th shipyard (Murmansk) Boat Project 1394 2010 "

======================
"Construction and built ships and submarines of the Navy of Russia:

in recent years:

Pr. 20380 Steregushchy Russia, 2008 Corvette --- 2 constructed 2 constructed
Pr. 22460 "Rubin" Russia in 2009 PSKR --- 1 built
Pr. 22350 "Admiral Gorshkov" Russia in 2011 Frigate --- 2 constructed
Pr. 21630 "Brawler" Russia 2007 MAC --- 1 built in 2006, 2 under construction
Pr. 20370 Russia, 2001 Boat Relations --- 4 constructed
Pr. 20180 "asterisk" Russia, 2007 PTS --- 1 in 2007 1 in the series will be constructed 5.6 pc. minimum, (the need for more than 10).
Pr. 20120 Russia, 2008 Experimental submarine 1 has SF - B-90 "Sarov"
Pr. 18280 Russia, 2004 Ship Communications 1 built Admiral Yuri Ivanov, 1 in the building. CERs, ie scout
Pr. 11711 Ivan Gren "Russia, 2012 BDK 1 is constructed in term BaltF 5
Pr. 16810 Russia, 2007 Deep apparatus 2 constructed "Rus" and "The Consul"
Pr. 14230 "Sokzhoy" Russia, 2002 PC 2 built
Pr. 1244.1 Thunder Russia, in 2009 MRS 1 in 2009 now "Borodino", a training ship, installed SAM polyment "(?)
Pr. 1431 "Mirage" Russia, 2001 PC 3 BB - 2, KF - 1.
Pr. 1166.1 Gepard, Russia, 2001 MIC 2 built Tatarstan and Dagestan "Series - 10.
Pr. 1244.1 Thunder Russia, 2011 Frigate 1 to 2011
Pr. 266,8 "Agat" Russia, 2007 MT 1 constructed BF (= pr.02268 "Adm. Zakhar'in" put on the Black Sea Fleet)
Pr. 10410 / 2 "Firefly" USSR, 1987 PC 1 is constructed
Pr. 955 / A "Northwind" / "Killer Whale" Russia, 2007 SSBNs 1 has 3 built, is preparing to bookmark 1
Pr. 885 "Ash" Russia, 2010 PLARK 1 is already nearly built. 1 is constructed. It is planned to tab 1 more during the year.
Pr. 677 "Lada" Russia, 2010 DPLT 1 built. 3 we construct.
Pr. 10830 "gate" Russia, 2003 ACS 1 built

Planned to built:
Pr. 677 "Lada" Russia, 2010 DPLT 3 we construct 4 to 2015 by the construction of 20-25 so far.
Pr.636M may still lay the pieces 6. (BSH)
Pr. 955 / A "Northwind" / "Killer Whale" Russia, 2007 SSBNs 1 3 laid the building is planned from 5 to 8
Pr. 885 "Ash" Russia, 2010 PLARK 1 is constructed, 1 laid the planned construction of at least 10
Add another 15 new pieces MTSAPL. (BSH)
Pr. 20180 "asterisk" Russia, 2007 PTS 1 in 2007 1 is built of 5-6 per term (the need for more than 10 pieces)
20380 "Pr. Steregushchy Russia, 2008 Corvette 1 4 laid by the construction of 20 (40 - BS)
Pr. 21630 "Brawler" Russia, in 2007 IAC 1 in 2006 2 built KF
Construction is planned from 5 to 7-15 to 2020
Pr. 22350 "Admiral Gorshkov Russia, 2011 Frigate 1 constructed 1 laid by the construction of 20
Completed BSH:
Destroyers pr.HHH - planned 10/12
UDC ... etc.



Supplement to the list.


For the Navy RUSSIA still under construction:
* Basic trawler Project 12700 "Alexandrite". Currently under construction two ships that proekta.Prim .- minesweepers-seekers mines, rather than the usual MT

* Small landing craft air cavity of the project 21820 "Dugong".
Currently under construction, one ship of this project, announced an order up to ten "dugong."

* Ship communications project 18280. Currently being built one ship of the project, announced an order for a total of two ships of the project 18280.

* Salvage ship project 21300S. At present, construction of one vessel type, announced an order for a total of four vessels project 21300S.

* Rescue ship "Igor Belousov"
Construct JSC "Admiralty Shipyards". Incorporated December 24, 2005. Delivery of the Navy announced in 2011.

* Naval Weapons Project 21130 "Diskant. Currently under construction, one ship of this project. Laid down in 2008 renting in 2011.

* Naval Weapons (search-and-transport ship) project 20180. Currently under construction, one ship of this project.

* The vessel loader project 20360 "Dubnyak. Currently being built one ship of the project, announced the order of the two "Dubnyak.

* Opytovoe ship project 11982. Currently built single vessel. Seliger incorporated July 8, 2009. Delivery of the Navy announced in 2011.

* Marine rescue tug project 22030. Currently being built one ship of the project, announced the order of three tugs. Delivery of the first - in 2011.

* Marine rescue tug draft 745MB "Walrus". currently being built two ships of this project (in the modification of 745MB), announced an order for a total of four "walrus.

* A small survey vessel Project 19910. The parent vessel ( "Vaigach") joined the fleet in 2008. Currently being built one vessel of this type, announced an order for a total of four vessels of the project 19910.

* Large hydrographic boat of 19920 (19920B). The head-cutter of the project BGK-2090 joined the Navy in 2008. Currently under construction a boat of this type.

* Raid lift project 90600. Since 2003, built 18 tugs Project 90600 (including one for the Navy of Russia). Currently under construction 2 vessels of the project, announced by order of RF Navy a total of five tugs.

* Also ordered:

OAO "Baltic Shipyard" Yantar "(Kaliningrad) agor project 22010 2013
OAO "East Wharf" (Vladivostok) landing craft in 2011
"Okskaya Shipyard (Navashino, Nizhny Novgorod Region). The vessel loader project 20360 2010
Khabarovsk Shipbuilding Plant "Two sea rescue tug project 22030 2011 year
OAO Zelenodolsk Plant. Gorky (Zelenodolsk, Tatarstan), two sea rescue tug draft 745MB 2010 and 2011
Astrakhan shipyard raid lift project 705B in 2011
JSC "Leningrad Shipyard" Pella "" Two harbor tugs Project 90600 2010 and 2011
JSC Sokol'skaya Shipyard "(p. Sokol, Nizhni Novgorod reg.) Raid boat of 1388NZ 2010
OJSC "Shipbuilding Plant. October Revolution" (Blagoveshchensk, Amur region.) Two self-propelled barges 2009 and 2010
35 th shipyard (Murmansk) Boat Project 1394 2010 "
大哥不认识字。。文盲
项目12700比较有亮点,


全复合材料艇........
又见方言,普及普通话真的很重要
8000t+的巡驱舰呢?6艘航妈呢?
zebraxiaozi 发表于 2011-2-4 17:40


    那种项目不是一个官员个人表态认为应该建就建的。
http://russiadefence.englishboard.net/t647-russian-navy-status


各个项目概要,补充一下。
慢慢喘气吧
11356M
雪千寻 发表于 2011-2-4 18:57


    老大, 究竟M型和印度版有啥区别?
JSTCVW09CD 发表于 2011-2-4 19:39
从上次某位网友贴的图看,最直观的区别是上了垂发
翻译了吗
惊现失真大活宝的210核潜艇。失真威武!
CCCPISM 发表于 2011-2-4 21:56


    转帖时没仔细看,

这个和失真介绍的还真不一样。
054能改到22350的技术水平就追到世界水平了
回复 14# JSTCVW09CD


    失真的小马驹210核潜艇还有beta2?
说毛子的E文文章被发到中国的论坛上
uoxxj 发表于 2011-2-5 09:51


    吨位都不是一个等级的
需要办个扫盲班
CCCPISM 发表于 2011-2-5 13:34

那个210,现在都汗.....
这E文,看不懂啊