2011年10月份专访雷宾斯克科学技术中心总师-129项目总设 ...

来源:百度文库 编辑:超级军网 时间:2024/04/28 18:36:56
http://vpk-news.ru/articles/8228


==

俄军事出版物-军工信使出版了ITAR-TASS 塔斯新闻社对于土星雷宾斯克科学技术中心总监, 总设计师, 129项目总设计师的专访。

全文的google翻译版如下:




-
ngine for future aviation complex tactical aircraft (PAK FA), its development and possible progress of the project, the use of new technologies and materials - all this told in an exclusive interview with "military-industrial complex" Yevhen Marchuk, chief designer and director of the Scientific and Technical Center named after a . I. Cradles - the branch of JSC "NPO" Saturn "United Engine Corporation.

- E vgeny Yuvenalievich during the years of transition to a new economic system, Russia lost its leading position in many high-tech fields, including in aircraft, as well as in the intellectual segment of it - engine building. Do not passed the point of no return? Can we catch up with competitors? If so, how, in your opinion, should catch up?

- For two decades, the domestic engine building, to use sports terminology, almost a circle has lagged behind their foreign colleagues and competitors. So we never go out of leaders, if we try to catch up with global manufacturers of aircraft engines simple exertion of all his powers, following the traditional on the treadmill of scientific and technological progress. Cut is necessary, and run obliquely forward escape. In sports, this is unacceptable, and the technique has its own, special rules of the game.

- How to cut?

- Use of new materials made achievements in other areas of technical expertise. There is good cause to the fact that we do not only competitive aviation engine for the PAK FA, and aircraft engines followed by a generation.

Now all gas turbine engines is implemented so-called Brayton cycle: heat supply at constant pressure. Features of this engine suitable to its limit, it actually has exhausted itself, as exhausted at the time the piston engine. Of course, you can increase efficiency by two to three percent, but in general it does not solve the problem. The problem is that the specific impulse increased by 50-60 percent.

In pure science discoveries are made that can dramatically affect the development of technology. But the development of technological systems themselves going in steps, incrementally. Here is the engine for the PAK FA will surpass even though all the parameters already created motors, yet to be made using the already existing scientific and technological base. Of course, there will be new ceramic materials can withstand very high temperatures. High-pressure turbine can operate without cooling vanes, bearings - no lubrication. HPT inlet temperature exceeds the combustion temperature of kerosene at 2300 degrees. This will limit opportunities for improving the parameters of modern aircraft engines. The current shape of the engine will continue for fifteen to twenty years. Much depends on how quickly begin to improve material properties.

- This is a more distant prospect. Let's still talk about our time. What is the current engine for the PAK FA?

- Now for the PAK FA made the engine, under the symbol "article 117". He is at the stage of preliminary test - bench and flight that are successful. Some elements borrowed from developments in the creation of the engine, "117S" for Su-35 fighter, in particular the design methods and calculations, processing technology complex structural elements.


Engine "117C" - this is not an easy upgrade of the AL-31F, as sometimes you can read in the press. Thrust in his two tons higher than the AL-31F. Get these two tonnes in the same dimensions is not easy. The engine is a new low-pressure compressor. Substantially upgraded high-pressure compressor. The new combustion chamber. The new turbine. Almost all new sites. The engine is 80 percent of new parts.

And on the "Product 117" for the PAK FA first phase (T-50) even more traction than the "117C". In addition, it is a fundamentally new system of automatic control systems (ACS) - a fully digital, with full responsibility. For the first time it will be built on the Russian element base. Architecture of the system, the control algorithm it is also Russian. We want the cell and the base was Russia, though we have a whole list of permits for the use of foreign bases. Such a domestic engine building was not yet. To solve this problem, the Russian Ministry of Industry and allocates funds. Carried out research work under the name "ACS promising product." Selected a good team of designers ACS, there is a certain reserve, and we are confident of success.

- What is it - the stage of preliminary tests of the T-50, which you mentioned?
- Pre-test phase - the most labor-intensive period in the creation of aircraft engines, both in time and in money. As implemented new design elements, something can go wrong. We have to redo something, again experiencing. If necessary, to a working design documentation (RCU). And that's it - time and money. High consumption of expensive kerosene for flight tests, etc. Just at this stage on the final day of the MAKS-2011 was not held the launching T-50. The weather was rainy. Low clouds. Poor visibility. The plane stopped the run.

- So what happened?
- Surge. Aircraft engine - this is probably the hardest thing in the engineering of the product. The cost of failure is very high both in financial costs and in terms of national defense. Therefore, when the slightest deviation from the standard modes of engine test pilot must stop the rise of what was done. Although before the T-50 met all scheduled flights without any problems. Carried out by the analysis revealed a deviation in the automation engine, which led to the surge. Inspections have shown that the engine is not damaged. Indeed, the day he was ready to continue the flight test.

- What are the further procedure in the way of production of the new engine?
- Upon completion of the complex pre-test engine presented to the state tests. To carry them out, a commission of military and civilian personnel. Under the supervision of the committee members are assembled engine. Conducted its tests. Then he goes, the commission examines it again, write a conclusion. After doing all this work is carried out if necessary adjustment RKD and at the same time mass-produced products. Although some elements of the first stage of engine design for PAK FA is already made, because their characteristics are fully confirmed by bench modes. By late 2011, will assess the technical specifications on the flight modes. The existing cooperation between enterprises on the design ("Saturn") and the release of "Product 117" (Ufa Engine Industrial Association) is completely justified. We expect that by 2013, developers and production workers have to go on holding the state tests.

- The name of the "engine for the PAK FA of the first stage," says that should be the engine of the second stage. Is not it?

- It's true. Bookmark it done. The engine is made. In all major characteristics, it will surpass the "117 product", in particular for higher traction and less weight. The ratio of the mass of the engine thrust is characterized by its important to dvigatelisty concept - specific gravity. Number not name, have no right. Let me just say that it will be significantly higher than that created by overseas counterparts, and the technical configuration of the motor to change substantially.

- And what about the supersonic regime besforsazhny: some experts in the Russian aviation industry claim that the supersonic cruise flight will provide the engine is the first stage?

- Again, hard for me to comment on. We'll see. The most intense competition in the world is the place to be is in a high-tech industrial sector. In this area, a potential competitor, a lot can be said not only the specific parameters of a unit, system, site or product as a whole, but only the interest of scientists and developers to a particular issue, only ideology of the system, the general trends conducted in the laboratories research. In the history of many examples in this regard. But the most significant of these is the creation of a "superbomb" with great striking features, ie nuclear weapons before the war and during the Second World War. Then, the fact researchers show interest to a particular line of research was able to say much about the art. In the Technosphere our time, in ever-increasing competition between states in fact little has changed in this regard.

Planck's tactical and technical characteristics of the second stage engine for the PAK FA raised an unprecedented high. To develop such an engine - means to solve a rather serious scientific and engineering, scientific and technical challenge. She put the military and political leadership. The engine should be no worse than the Americans. But this can be achieved only if, I repeat, if run diagonally. Since some time in the 90's new in aero engines are not created.

- How do you assess the changes in the organizational structure of the domestic industry aeroengine?
- In the early 2000s were heated debates and even battles for the right to be the leading designer of the engine PAK FA. Now it is created in the United Engine Corporation (JDC). Cooperation is not formed in opposition of the potential prime contractor, and under central leadership of the JDC. That is correct. Because the competition should be between suppliers of components, thereby improving their quality. And at the head of Russia's long-term integrator of aero-engine competitor must stay outside the country - the "Rolls Royce", "General Electric", "Pratt & Whitney" and other grandees of the world engine.

I support the elimination of competitive relations between the Rybinsk "Saturn" Moscow and the "Salute." In KB "Salyut" work came from the SEC named the cradle, which is a branch of Moscow "Saturn". Work on the conceptual design of the second stage engine for both the PAK FA CB are together. General Designer of KB "Salyut" Kolotnikov Michael - my friend and colleague, who had for ten years worked in the Bank "Saturn."

Now in Russian aviation engine develops a normal creative atmosphere, manifested the same synergistic effect, which many experts say earlier on various aviation events. People are no longer close to each other and work openly, helping each other.

But we should not get involved in restructuring actions in the DCS. The main thing - the result, rather than the process of change for the sake of change. Say, can not plant a serial lead developers. Cooperation to build the engine for the PAK FA second phase will be expanded. Added new CB, new factories. This is natural, since in various companies and design aircraft engine there are novelties in the field of technology, the best solutions in the design of various components and design elements. These companies will join and co-operation. As part of the JDC program launched the creation of centers of competence: the casting, making the blades, coating, different types of welds, etc. The principle is: which company is better and cheaper to obtain, the plant and becomes a center of competence. This will be one of the most important tools to improve quality, and hence the competitiveness of the company's products.

Yevhen Marchuk
Interviewed by Yevgeny Nikitin ,http://vpk-news.ru/articles/8228


==

俄军事出版物-军工信使出版了ITAR-TASS 塔斯新闻社对于土星雷宾斯克科学技术中心总监, 总设计师, 129项目总设计师的专访。

全文的google翻译版如下:




-
ngine for future aviation complex tactical aircraft (PAK FA), its development and possible progress of the project, the use of new technologies and materials - all this told in an exclusive interview with "military-industrial complex" Yevhen Marchuk, chief designer and director of the Scientific and Technical Center named after a . I. Cradles - the branch of JSC "NPO" Saturn "United Engine Corporation.

- E vgeny Yuvenalievich during the years of transition to a new economic system, Russia lost its leading position in many high-tech fields, including in aircraft, as well as in the intellectual segment of it - engine building. Do not passed the point of no return? Can we catch up with competitors? If so, how, in your opinion, should catch up?

- For two decades, the domestic engine building, to use sports terminology, almost a circle has lagged behind their foreign colleagues and competitors. So we never go out of leaders, if we try to catch up with global manufacturers of aircraft engines simple exertion of all his powers, following the traditional on the treadmill of scientific and technological progress. Cut is necessary, and run obliquely forward escape. In sports, this is unacceptable, and the technique has its own, special rules of the game.

- How to cut?

- Use of new materials made achievements in other areas of technical expertise. There is good cause to the fact that we do not only competitive aviation engine for the PAK FA, and aircraft engines followed by a generation.

Now all gas turbine engines is implemented so-called Brayton cycle: heat supply at constant pressure. Features of this engine suitable to its limit, it actually has exhausted itself, as exhausted at the time the piston engine. Of course, you can increase efficiency by two to three percent, but in general it does not solve the problem. The problem is that the specific impulse increased by 50-60 percent.

In pure science discoveries are made that can dramatically affect the development of technology. But the development of technological systems themselves going in steps, incrementally. Here is the engine for the PAK FA will surpass even though all the parameters already created motors, yet to be made using the already existing scientific and technological base. Of course, there will be new ceramic materials can withstand very high temperatures. High-pressure turbine can operate without cooling vanes, bearings - no lubrication. HPT inlet temperature exceeds the combustion temperature of kerosene at 2300 degrees. This will limit opportunities for improving the parameters of modern aircraft engines. The current shape of the engine will continue for fifteen to twenty years. Much depends on how quickly begin to improve material properties.

- This is a more distant prospect. Let's still talk about our time. What is the current engine for the PAK FA?

- Now for the PAK FA made the engine, under the symbol "article 117". He is at the stage of preliminary test - bench and flight that are successful. Some elements borrowed from developments in the creation of the engine, "117S" for Su-35 fighter, in particular the design methods and calculations, processing technology complex structural elements.


Engine "117C" - this is not an easy upgrade of the AL-31F, as sometimes you can read in the press. Thrust in his two tons higher than the AL-31F. Get these two tonnes in the same dimensions is not easy. The engine is a new low-pressure compressor. Substantially upgraded high-pressure compressor. The new combustion chamber. The new turbine. Almost all new sites. The engine is 80 percent of new parts.

And on the "Product 117" for the PAK FA first phase (T-50) even more traction than the "117C". In addition, it is a fundamentally new system of automatic control systems (ACS) - a fully digital, with full responsibility. For the first time it will be built on the Russian element base. Architecture of the system, the control algorithm it is also Russian. We want the cell and the base was Russia, though we have a whole list of permits for the use of foreign bases. Such a domestic engine building was not yet. To solve this problem, the Russian Ministry of Industry and allocates funds. Carried out research work under the name "ACS promising product." Selected a good team of designers ACS, there is a certain reserve, and we are confident of success.

- What is it - the stage of preliminary tests of the T-50, which you mentioned?
- Pre-test phase - the most labor-intensive period in the creation of aircraft engines, both in time and in money. As implemented new design elements, something can go wrong. We have to redo something, again experiencing. If necessary, to a working design documentation (RCU). And that's it - time and money. High consumption of expensive kerosene for flight tests, etc. Just at this stage on the final day of the MAKS-2011 was not held the launching T-50. The weather was rainy. Low clouds. Poor visibility. The plane stopped the run.

- So what happened?
- Surge. Aircraft engine - this is probably the hardest thing in the engineering of the product. The cost of failure is very high both in financial costs and in terms of national defense. Therefore, when the slightest deviation from the standard modes of engine test pilot must stop the rise of what was done. Although before the T-50 met all scheduled flights without any problems. Carried out by the analysis revealed a deviation in the automation engine, which led to the surge. Inspections have shown that the engine is not damaged. Indeed, the day he was ready to continue the flight test.

- What are the further procedure in the way of production of the new engine?
- Upon completion of the complex pre-test engine presented to the state tests. To carry them out, a commission of military and civilian personnel. Under the supervision of the committee members are assembled engine. Conducted its tests. Then he goes, the commission examines it again, write a conclusion. After doing all this work is carried out if necessary adjustment RKD and at the same time mass-produced products. Although some elements of the first stage of engine design for PAK FA is already made, because their characteristics are fully confirmed by bench modes. By late 2011, will assess the technical specifications on the flight modes. The existing cooperation between enterprises on the design ("Saturn") and the release of "Product 117" (Ufa Engine Industrial Association) is completely justified. We expect that by 2013, developers and production workers have to go on holding the state tests.

- The name of the "engine for the PAK FA of the first stage," says that should be the engine of the second stage. Is not it?

- It's true. Bookmark it done. The engine is made. In all major characteristics, it will surpass the "117 product", in particular for higher traction and less weight. The ratio of the mass of the engine thrust is characterized by its important to dvigatelisty concept - specific gravity. Number not name, have no right. Let me just say that it will be significantly higher than that created by overseas counterparts, and the technical configuration of the motor to change substantially.

- And what about the supersonic regime besforsazhny: some experts in the Russian aviation industry claim that the supersonic cruise flight will provide the engine is the first stage?

- Again, hard for me to comment on. We'll see. The most intense competition in the world is the place to be is in a high-tech industrial sector. In this area, a potential competitor, a lot can be said not only the specific parameters of a unit, system, site or product as a whole, but only the interest of scientists and developers to a particular issue, only ideology of the system, the general trends conducted in the laboratories research. In the history of many examples in this regard. But the most significant of these is the creation of a "superbomb" with great striking features, ie nuclear weapons before the war and during the Second World War. Then, the fact researchers show interest to a particular line of research was able to say much about the art. In the Technosphere our time, in ever-increasing competition between states in fact little has changed in this regard.

Planck's tactical and technical characteristics of the second stage engine for the PAK FA raised an unprecedented high. To develop such an engine - means to solve a rather serious scientific and engineering, scientific and technical challenge. She put the military and political leadership. The engine should be no worse than the Americans. But this can be achieved only if, I repeat, if run diagonally. Since some time in the 90's new in aero engines are not created.

- How do you assess the changes in the organizational structure of the domestic industry aeroengine?
- In the early 2000s were heated debates and even battles for the right to be the leading designer of the engine PAK FA. Now it is created in the United Engine Corporation (JDC). Cooperation is not formed in opposition of the potential prime contractor, and under central leadership of the JDC. That is correct. Because the competition should be between suppliers of components, thereby improving their quality. And at the head of Russia's long-term integrator of aero-engine competitor must stay outside the country - the "Rolls Royce", "General Electric", "Pratt & Whitney" and other grandees of the world engine.

I support the elimination of competitive relations between the Rybinsk "Saturn" Moscow and the "Salute." In KB "Salyut" work came from the SEC named the cradle, which is a branch of Moscow "Saturn". Work on the conceptual design of the second stage engine for both the PAK FA CB are together. General Designer of KB "Salyut" Kolotnikov Michael - my friend and colleague, who had for ten years worked in the Bank "Saturn."

Now in Russian aviation engine develops a normal creative atmosphere, manifested the same synergistic effect, which many experts say earlier on various aviation events. People are no longer close to each other and work openly, helping each other.

But we should not get involved in restructuring actions in the DCS. The main thing - the result, rather than the process of change for the sake of change. Say, can not plant a serial lead developers. Cooperation to build the engine for the PAK FA second phase will be expanded. Added new CB, new factories. This is natural, since in various companies and design aircraft engine there are novelties in the field of technology, the best solutions in the design of various components and design elements. These companies will join and co-operation. As part of the JDC program launched the creation of centers of competence: the casting, making the blades, coating, different types of welds, etc. The principle is: which company is better and cheaper to obtain, the plant and becomes a center of competence. This will be one of the most important tools to improve quality, and hence the competitiveness of the company's products.

Yevhen Marchuk
Interviewed by Yevgeny Nikitin ,


This is a more distant prospect. Let's still talk about our time. What is the current engine for the PAK FA?

记者: 说说目前T-50上面的发动机吧


总师: - Now for the PAK FA made the engine, under the symbol "article 117". He is at the stage of preliminary test - bench and flight that are successful. Some elements borrowed from developments in the creation of the engine, "117S" for Su-35 fighter, in particular the design methods and calculations, processing technology complex structural elements.


目前T-50上面的发动机代号article 117, 正在处于初步测试阶段,台架和飞行测试很成功。 该发动机的一些元素借助于苏-35的117C的研发。 特别是117C的设计方法和计算方法, 复杂结构部件的工艺技术。

( 117 和117C的共性和差异)


Engine "117C" - this is not an easy upgrade of the AL-31F, as sometimes you can read in the press. Thrust in his two tons higher than the AL-31F. Get these two tonnes in the same dimensions is not easy. The engine is a new low-pressure compressor. Substantially upgraded high-pressure compressor. The new combustion chamber. The new turbine. Almost all new sites. The engine is 80 percent of new parts.

(117C和31F的差异) 117C 相对于31F, 有全新的LPC, 深度改进的HPC,  全新的燃烧室,全新的高低压涡轮。  整机80%的零部件都是新的。


And on the "Product 117" for the PAK FA first phase (T-50) even more traction than the "117C". In addition, it is a fundamentally new system of automatic control systems (ACS) - a fully digital, with full responsibility. For the first time it will be built on the Russian element base. Architecture of the system, the control algorithm it is also Russian. We want the cell and the base was Russia, though we have a whole list of permits for the use of foreign bases. Such a domestic engine building was not yet. To solve this problem, the Russian Ministry of Industry and allocates funds. Carried out research work under the name "ACS promising product." Selected a good team of designers ACS, there is a certain reserve, and we are confident of success.

产品117作为第一节发动机,有比117C 更多的推力。  另外, 全新的FADEC, 全部俄罗斯本地的零部件制造。  架构和控制率 也是全俄罗斯开发。

==================


- The name of the "engine for the PAK FA of the first stage," says that should be the engine of the second stage. Is not it?

记者:  第二节度发动机的问题



- It's true. Bookmark it done. The engine is made. In all major characteristics, it will surpass the "117 product", in particular for higher traction and less weight. The ratio of the mass of the engine thrust is characterized by its important to dvigatelisty concept - specific gravity. Number not name, have no right. Let me just say that it will be significantly higher than that created by overseas counterparts, and the technical configuration of the motor to change substantially.

总师:  第二阶段发动机已经完成了制造。  所有的主要特性都超过产品117. 特别是更加高的推力, 低于117的重量 。  blabla。

总师表示, 推重比要significantly 超过目前西方的同类发动机。


=====================


粗略整理一下, 将就着看看吧。


--


This is a more distant prospect. Let's still talk about our time. What is the current engine for the PAK FA?

记者: 说说目前T-50上面的发动机吧


总师: - Now for the PAK FA made the engine, under the symbol "article 117". He is at the stage of preliminary test - bench and flight that are successful. Some elements borrowed from developments in the creation of the engine, "117S" for Su-35 fighter, in particular the design methods and calculations, processing technology complex structural elements.


目前T-50上面的发动机代号article 117, 正在处于初步测试阶段,台架和飞行测试很成功。 该发动机的一些元素借助于苏-35的117C的研发。 特别是117C的设计方法和计算方法, 复杂结构部件的工艺技术。

( 117 和117C的共性和差异)


Engine "117C" - this is not an easy upgrade of the AL-31F, as sometimes you can read in the press. Thrust in his two tons higher than the AL-31F. Get these two tonnes in the same dimensions is not easy. The engine is a new low-pressure compressor. Substantially upgraded high-pressure compressor. The new combustion chamber. The new turbine. Almost all new sites. The engine is 80 percent of new parts.

(117C和31F的差异) 117C 相对于31F, 有全新的LPC, 深度改进的HPC,  全新的燃烧室,全新的高低压涡轮。  整机80%的零部件都是新的。


And on the "Product 117" for the PAK FA first phase (T-50) even more traction than the "117C". In addition, it is a fundamentally new system of automatic control systems (ACS) - a fully digital, with full responsibility. For the first time it will be built on the Russian element base. Architecture of the system, the control algorithm it is also Russian. We want the cell and the base was Russia, though we have a whole list of permits for the use of foreign bases. Such a domestic engine building was not yet. To solve this problem, the Russian Ministry of Industry and allocates funds. Carried out research work under the name "ACS promising product." Selected a good team of designers ACS, there is a certain reserve, and we are confident of success.

产品117作为第一节发动机,有比117C 更多的推力。  另外, 全新的FADEC, 全部俄罗斯本地的零部件制造。  架构和控制率 也是全俄罗斯开发。

==================


- The name of the "engine for the PAK FA of the first stage," says that should be the engine of the second stage. Is not it?

记者:  第二节度发动机的问题



- It's true. Bookmark it done. The engine is made. In all major characteristics, it will surpass the "117 product", in particular for higher traction and less weight. The ratio of the mass of the engine thrust is characterized by its important to dvigatelisty concept - specific gravity. Number not name, have no right. Let me just say that it will be significantly higher than that created by overseas counterparts, and the technical configuration of the motor to change substantially.

总师:  第二阶段发动机已经完成了制造。  所有的主要特性都超过产品117. 特别是更加高的推力, 低于117的重量 。  blabla。

总师表示, 推重比要significantly 超过目前西方的同类发动机。


=====================


粗略整理一下, 将就着看看吧。


--
等下整理一下。
翻得一塌糊涂。
哪个阶段?核心机?原型机?
啥时候咱们也能官泻一点WS-15啊,整天大家猜来猜去,搞不好又猜出谣言来了
{:soso_e127:}这都翻的啥玩意
翻译在哪里?
哦米嘎,这是把毛文翻成英文的吧,压力大啊
能不能翻译中文啊
很希望有人能翻译看看
二元屎推不知道上了没有
这都翻的啥玩意
各位知足吧,楼主一个不懂毛文的人,经常去毛子论坛上淘一些不可证实的信息,用谷歌机器转成英文,贴过来给你们这些没耐心读英文的中国人看。如此一来,你们也不知道这些消息靠不靠谱了,只能听他随意加几句中文解说,无非就是毛子又大放光芒啦,又出新神器啦,啥啥项目又获可喜进展啦。。。。你不信?你有反证么??
大陆 发表于 2011-10-12 11:24
这都翻的啥玩意
看二楼。
红色网格 发表于 2011-10-12 11:34
各位知足吧,楼主一个不懂毛文的人,经常去毛子论坛上淘一些不可证实的信息,用谷歌机器转成英文,贴过来给 ...
乃谈西方的时候。 西方的英式英语, 法语,意大利语, 德语, 乃懂几门?


给本菜掰和一下。 ;P
大陆 发表于 2011-10-12 11:24
这都翻的啥玩意
能读英文的一看就知道了。  2楼也整理了一耙。
钱才是核心……

DPEinC=PE 发表于 2011-10-12 13:41
乃谈西方的时候。 西方的英式英语, 法语,意大利语, 德语, 乃懂几门?


那我是不是也可以问下你谈毛子的时候,毛文你看得懂么?
DPEinC=PE 发表于 2011-10-12 13:41
乃谈西方的时候。 西方的英式英语, 法语,意大利语, 德语, 乃懂几门?


那我是不是也可以问下你谈毛子的时候,毛文你看得懂么?
还是翻译成中文吧,不过发表于什么地方中国读者也不大容易查证,姑妄听之
茅塞不开 发表于 2011-10-12 11:03
二元屎推不知道上了没有
T50号称用3块钱的,2块的不要
重量低于117墙裂怀疑129的推力了
涡轮 发表于 2011-10-12 16:54
重量低于117墙裂怀疑129的推力了
推动比高了呀。。。
lxf11711 发表于 2011-10-12 17:19
推动比高了呀。。。
毛发最水的指标就是推比了,我是真的很难相信129比117轻的重量或者是与117相当的重量实现18吨的推力
DPEinC=PE 发表于 2011-10-12 13:41
乃谈西方的时候。 西方的英式英语, 法语,意大利语, 德语, 乃懂几门?
别这么trolling,等哪天我也自封个英委员、法委员、意委员、德委员啥的,自己不懂人家的语言,但是却经常去人家的论坛上淘图片和小道消息,用谷歌统一转成国人大多不熟的英文,再缀上几句肉麻的吹捧文字,转帖到CD,谁敢质疑,就率领一众粉丝大肆攻击之,或者直接诱迫对方爆粗口,然后举报版主惩罚之。。。等你看到我也这么干了,再来问这个问题,我绝对没意见。满意了没,委员马甲??
鬼神 发表于 2011-10-12 14:59
那我是不是也可以问下你谈毛子的时候,毛文你看得懂么?
如果你懂美式英语26个字母的准确发音, 不要求你懂法语,德语, 你就可以要求本菜谈俄式武器的时候懂俄语。;P


这个简单吧。
suzhoutiedao 发表于 2011-10-12 15:23
还是翻译成中文吧,不过发表于什么地方中国读者也不大容易查证,姑妄听之
军工信使是俄军报。
红色网格 发表于 2011-10-12 17:53
别这么trolling,等哪天我也自封个英委员、法委员、意委员、德委员啥的,自己不懂人家的语言,但是却经常 ...
一个连俄军报-军工信使,俄塔斯新闻社都不知道的, 还跑到别人帖子里面来鬼扯。 也就是你了。


人真是不知道就什么都可以。 ;P
涡轮 发表于 2011-10-12 17:27
毛发最水的指标就是推比了,我是真的很难相信129比117轻的重量或者是与117相当的重量实现18吨的推力
发不发水, 人家的国家标准规定的。  懂得了标准就不存在水不水。
这 太考验外文了
现在怀疑Type 30 是不是就是这个。

DPEinC=PE 发表于 2011-10-12 18:07
一个连俄军报-军工信使,俄塔斯新闻社都不知道的, 还跑到别人帖子里面来鬼扯。 也就是你了。


说这东西的口气和说30很像,而且都是和117对照怎样怎样,我觉得应该就是一个东西了。
DPEinC=PE 发表于 2011-10-12 18:07
一个连俄军报-军工信使,俄塔斯新闻社都不知道的, 还跑到别人帖子里面来鬼扯。 也就是你了。


说这东西的口气和说30很像,而且都是和117对照怎样怎样,我觉得应该就是一个东西了。
苏联机器 发表于 2011-10-12 18:21
说这东西的口气和说30很像,而且都是和117对照怎样怎样,我觉得应该就是一个东西了。
现在觉得就是type 30.

chepkin的专访说type 30已经造出来并且测试了。  这一次又确认。

--

以前的消息是129处于初步设计阶段, 乱啊。
楼主整这么大堆有几个人能看完?而且还是谷歌翻译啊。你自己捡重要的翻译下大家看着就明了了啊。
DPEinC=PE 发表于 2011-10-12 18:24
现在觉得就是type 30.

chepkin的专访说type 30已经造出来并且测试了。  这一次又确认。
反正我原来也是这么说的,不会有TYPE30和129两个全新型号。
既然TYPE30不是117再改改,那就应该是129了。
关键是哪一步测试?造出来的是核心机还是原型机?
50725591 发表于 2011-10-12 18:25
楼主整这么大堆有几个人能看完?而且还是谷歌翻译啊。你自己捡重要的翻译下大家看着就明了了啊。
2楼啊。
苏联机器 发表于 2011-10-12 18:26
反正我原来也是这么说的,不会有TYPE30和129两个全新型号。
既然TYPE30不是117再改改,那就应该是129了。 ...
--

翻译的版本和原文出现了理解差异啊。

Flateric 出来说了。  the engine is laid down 和 the engine is made, 有差别。  这个太模糊了。

-
17.jpg
DPEinC=PE 发表于 2011-10-12 18:07
一个连俄军报-军工信使,俄塔斯新闻社都不知道的, 还跑到别人帖子里面来鬼扯。 也就是你了。
你以为全世界只有你听说过这些名词么?很遗憾,想当初老子还没接触网络,从《参考消息》上已经熟知一票国外媒体大名了,也包括你神神秘秘地列举出的这两个。。;P“人真是不知道就什么都可以”,这话说的太对了,请问你的T-50双S型进气道PPT图片,怎么不接着发了?你的“J-10B只能指望99M2,太行没戏”神论,怎么不接着说了??。。。你倒是啥都知道,可惜就是个鬼扯专业户。。;P
DPEinC=PE 发表于 2011-10-12 18:05
如果你懂美式英语26个字母的准确发音, 不要求你懂法语,德语, 你就可以要求本菜谈俄式武器的时候懂俄语 ...
俺老师教俺的时候没说啥美式读音,所以俺大声的承认俺不是个合格的美分~~~~~~那么我们的毛子宣传委员大人该不会说自己也是个不合格的毛粉吧~~~~
鬼神 发表于 2011-10-12 19:08
俺老师教俺的时候没说啥美式读音,所以俺大声的承认俺不是个合格的美分~~~~~~那么我们的毛子宣传委员大人 ...
围绕帖子内容不谈,尽扯些蛋疼的。

DPEinC=PE 发表于 2011-10-12 18:08
发不发水, 人家的国家标准规定的。  懂得了标准就不存在水不水。


如果是真的,是不是指核心机啊,加上其他部分就不是这个重量了。对了,有知道了毛标重量后计算其美标重量的方法木有啊?想知道117的美标重量有多少。
DPEinC=PE 发表于 2011-10-12 18:08
发不发水, 人家的国家标准规定的。  懂得了标准就不存在水不水。


如果是真的,是不是指核心机啊,加上其他部分就不是这个重量了。对了,有知道了毛标重量后计算其美标重量的方法木有啊?想知道117的美标重量有多少。