印表示:FGFA的初步设计合同已经成功履行--对印度工程师 ...

来源:百度文库 编辑:超级军网 时间:2024/04/27 22:33:52
===============
http://www.info4security.com/story.asp?sectioncode=9&storycode=4128183&c=1

==

俄罗斯-印度军事技术政府间委员会会议在莫斯科召开。

对所有项目的合作状况进行了评审回顾。



-
挑主要的说说。




第一,加速MTA中型运输机项目的步伐。


第二, 对于FGFA。


初步设计成功完成。 第二阶段设计合同将于2012年9月前定案。

对于印度工程师的将近20个系列课程的培训项目已经于2011年7月完成。




===============



With regard to the Fifth Generation Fighter Aircraft (FGFA), being jointly designed and developed by India and Russia, both sides noted that the first stage of the preliminary design contract has been successfully completed and the second stage of the PD contract is to be finalised before September, 2012.

The training programme for the Indian engineers covering nearly 20 courses was completed in July, 2011. Both sides agreed to continue discussions for finalization of the R&D contract as per the agreed time lines of the general contract signed in December, 2008.




India, Russia to step up defence ties

05 Oct 11


Distinct progress in India-Russia defence cooperation in last one year, says India's Defence Minister AK Antony.

India and Russia reviewed the defence ties in Moscow and expressed ‘readiness to take all necessary measures to further expand the cooperation on a mutually beneficial basis’.

In a protocol signed after the 11th meeting of the India-Russia Inter-Governmental Commission on military technical, co-chaired by the Defence Minister AK Antony and his Russian counterpart AE Serdyukov, the two sides noted with satisfaction that that during the period under review various diligent steps have been taken ‘to deepen interaction in the development of defence technologies, modernization of military equipment and joint manufacture of military-purpose products’.

Visibly happy at the outcome, Antony told a group of Indian journalists shortly after the talks: “Distinct improvements have taken place in the pace of progress of many critical projects in the last one year. We value our friendship a great deal. Together we would like to consolidate our relationship and take it forward”.

At the talks, the Indian delegation included the Defence Secretary Shashikant Sharma, Secretary Defence Production Shekhar Aggarwal, Indian Ambassador Ajai Malhotra, Lt Gen MS Buttar, Air Marshal RK Sharma, Vice Admiral NN Kumar, Chief Controller of Research & Development of DRDO Dr. Avinash Chander, CMD Hindustan Aeronautics Limited Ashok Nayak and DG Acquisition Vivek Rae.

Fruitful Outcome of Projects

Speaking at the meeting, Antony said India-Russia defence relationship has grown both in content and scope over the years. He said India highly values the time tested, strong and multi- faceted relationship with Russia.

Listing some of the projects where both sides have put in years of effort to bring success, Antony said, "The project for joint development and production of the Fifth Generation Fighter Aircraft, BrahMos missile system, licensed production in India of T-90 tanks and SU-30 MKI aircraft are proud examples of our strong relationship. We are sure that the success of these projects would be models for the implementation of several other projects of mutual interest," he said.

Referring to planned delivery of Aircraft Carrier INS Vikramaditya, Antony said, "We are keenly awaiting the induction of the Aircraft Carrier into the Indian Navy. This project has attracted considerable public attention in India. We hope that the induction will take place, on schedule, by end 2012. We also hope that all activities on the MiG-29K are completed to achieve synchronization with the aircraft carrier."

Delayed Export Clearances

Nevertheless, Antony drew the attention of the Russian side to the vexing issue of delayed export clearances for vital repair equipment for already contracted weapons systems. This has been affecting supplies of defence equipment and spares.

The Russian side assured the Indian side that the matter was receiving attention at highest levels in the Russian Government and efforts would made to institutionalize measures to avoid such delays in future.

Antony expressed India’s concern at the tardy progress made in the design and development of the Multi-Role Transport Aircraft (MTA). The two sides agreed to accelerate the progress of this project and they would be meeting later this month.

With regard to the Fifth Generation Fighter Aircraft (FGFA), being jointly designed and developed by India and Russia, both sides noted that the first stage of the preliminary design contract has been successfully completed and the second stage of the PD contract is to be finalised before September, 2012.

The training programme for the Indian engineers covering nearly 20 courses was completed in July, 2011. Both sides agreed to continue discussions for finalization of the R&D contract as per the agreed time lines of the general contract signed in December, 2008.
===============
http://www.info4security.com/story.asp?sectioncode=9&storycode=4128183&c=1

==

俄罗斯-印度军事技术政府间委员会会议在莫斯科召开。

对所有项目的合作状况进行了评审回顾。



-
挑主要的说说。




第一,加速MTA中型运输机项目的步伐。


第二, 对于FGFA。


初步设计成功完成。 第二阶段设计合同将于2012年9月前定案。

对于印度工程师的将近20个系列课程的培训项目已经于2011年7月完成。




===============



With regard to the Fifth Generation Fighter Aircraft (FGFA), being jointly designed and developed by India and Russia, both sides noted that the first stage of the preliminary design contract has been successfully completed and the second stage of the PD contract is to be finalised before September, 2012.

The training programme for the Indian engineers covering nearly 20 courses was completed in July, 2011. Both sides agreed to continue discussions for finalization of the R&D contract as per the agreed time lines of the general contract signed in December, 2008.




India, Russia to step up defence ties

05 Oct 11


Distinct progress in India-Russia defence cooperation in last one year, says India's Defence Minister AK Antony.

India and Russia reviewed the defence ties in Moscow and expressed ‘readiness to take all necessary measures to further expand the cooperation on a mutually beneficial basis’.

In a protocol signed after the 11th meeting of the India-Russia Inter-Governmental Commission on military technical, co-chaired by the Defence Minister AK Antony and his Russian counterpart AE Serdyukov, the two sides noted with satisfaction that that during the period under review various diligent steps have been taken ‘to deepen interaction in the development of defence technologies, modernization of military equipment and joint manufacture of military-purpose products’.

Visibly happy at the outcome, Antony told a group of Indian journalists shortly after the talks: “Distinct improvements have taken place in the pace of progress of many critical projects in the last one year. We value our friendship a great deal. Together we would like to consolidate our relationship and take it forward”.

At the talks, the Indian delegation included the Defence Secretary Shashikant Sharma, Secretary Defence Production Shekhar Aggarwal, Indian Ambassador Ajai Malhotra, Lt Gen MS Buttar, Air Marshal RK Sharma, Vice Admiral NN Kumar, Chief Controller of Research & Development of DRDO Dr. Avinash Chander, CMD Hindustan Aeronautics Limited Ashok Nayak and DG Acquisition Vivek Rae.

Fruitful Outcome of Projects

Speaking at the meeting, Antony said India-Russia defence relationship has grown both in content and scope over the years. He said India highly values the time tested, strong and multi- faceted relationship with Russia.

Listing some of the projects where both sides have put in years of effort to bring success, Antony said, "The project for joint development and production of the Fifth Generation Fighter Aircraft, BrahMos missile system, licensed production in India of T-90 tanks and SU-30 MKI aircraft are proud examples of our strong relationship. We are sure that the success of these projects would be models for the implementation of several other projects of mutual interest," he said.

Referring to planned delivery of Aircraft Carrier INS Vikramaditya, Antony said, "We are keenly awaiting the induction of the Aircraft Carrier into the Indian Navy. This project has attracted considerable public attention in India. We hope that the induction will take place, on schedule, by end 2012. We also hope that all activities on the MiG-29K are completed to achieve synchronization with the aircraft carrier."

Delayed Export Clearances

Nevertheless, Antony drew the attention of the Russian side to the vexing issue of delayed export clearances for vital repair equipment for already contracted weapons systems. This has been affecting supplies of defence equipment and spares.

The Russian side assured the Indian side that the matter was receiving attention at highest levels in the Russian Government and efforts would made to institutionalize measures to avoid such delays in future.

Antony expressed India’s concern at the tardy progress made in the design and development of the Multi-Role Transport Aircraft (MTA). The two sides agreed to accelerate the progress of this project and they would be meeting later this month.

With regard to the Fifth Generation Fighter Aircraft (FGFA), being jointly designed and developed by India and Russia, both sides noted that the first stage of the preliminary design contract has been successfully completed and the second stage of the PD contract is to be finalised before September, 2012.

The training programme for the Indian engineers covering nearly 20 courses was completed in July, 2011. Both sides agreed to continue discussions for finalization of the R&D contract as per the agreed time lines of the general contract signed in December, 2008.
============


对于FGFA的设计, 也是手把手的培训哎。  
其他讨论的项目包括: 不拉莫斯,许可证生产T-90C, 苏-30MKI, 米格-29K , 改装航母等

-

Fruitful Outcome of Projects

Speaking at the meeting, Antony said India-Russia defence relationship has grown both in content and scope over the years. He said India highly values the time tested, strong and multi- faceted relationship with Russia.

Listing some of the projects where both sides have put in years of effort to bring success, Antony said, "The project for joint development and production of the Fifth Generation Fighter Aircraft, BrahMos missile system, licensed production in India of T-90 tanks and SU-30 MKI aircraft are proud examples of our strong relationship. We are sure that the success of these projects would be models for the implementation of several other projects of mutual interest," he said.

Referring to planned delivery of Aircraft Carrier INS Vikramaditya, Antony said, "We are keenly awaiting the induction of the Aircraft Carrier into the Indian Navy. This project has attracted considerable public attention in India. We hope that the induction will take place, on schedule, by end 2012. We also hope that all activities on the MiG-29K are completed to achieve synchronization with the aircraft carrier."


{:soso_e127:} 宣委啊
还记得当初贴印度那航母的进度表吗?
现在看看进度到那里了{:soso_e120:}

毛子宣称的东西,有多少值得可信?特别是伙同印度的,坑钱的两家伙,眉来眼去,再送几个美女就又可以忽悠啦

{:soso_e127:} 宣委啊
还记得当初贴印度那航母的进度表吗?
现在看看进度到那里了{:soso_e120:}

毛子宣称的东西,有多少值得可信?特别是伙同印度的,坑钱的两家伙,眉来眼去,再送几个美女就又可以忽悠啦
不知道乃看到了那张表了没?   上面的蚯蚓字认全了不?  
A3的FGFA就是一个钓鱼工程,充当T50的实验机型
三哥就一个喜剧演员,一看到他的新闻我就想乐。
每次看到三锅的新闻都很喜感


毛子钓鱼工程,阿三的那些腐败官员更是欢欣鼓舞滴希望被钓鱼,这样回扣才能细水长流的多多啊,阿三的官员会陆陆续续滴提出各种各样的要求和改变, 被坑的只有阿三的国防费。。

J搬运工是没有足够的脑细胞提升这样的觉悟滴。。

毛子钓鱼工程,阿三的那些腐败官员更是欢欣鼓舞滴希望被钓鱼,这样回扣才能细水长流的多多啊,阿三的官员会陆陆续续滴提出各种各样的要求和改变, 被坑的只有阿三的国防费。。

J搬运工是没有足够的脑细胞提升这样的觉悟滴。。
FAFG是T-50发展型吗?还是另起炉灶?
建议毛宣委开个帖子,详细介绍、汇总一下目前三哥和毛子合作的,以及自研的五代机项目

实在是有点太乱了,尤其是爱用英文简写
avaion 发表于 2011-10-7 02:40
宣委啊
还记得当初贴印度那航母的进度表吗?
现在看看进度到那里了
是得  毛子说的东西真不靠谱 话说毛子真要做到实在 就不会想方设法的A印度小钱钱了。。
DPEinC=PE 发表于 2011-10-7 08:03
不知道乃看到了那张表了没?   上面的蚯蚓字认全了不?
你倒是有本事贴出来嘛{:jian:}
记得附带原文连接

这年头还有翻译机,翻译成英文无压力
o(∩_∩)o 哈哈 想起你那时候的话,真是对比现在,真实悲催的很啊{:jian:}
th945 发表于 2011-10-7 09:35
是得  毛子说的东西真不靠谱 话说毛子真要做到实在 就不会想方设法的A印度小钱钱了。。
宣委还把毛子的话当真的,这要多么善良纯洁的人才如此相信毛子啊{:jian:}
这年头很难得啊{:hao:}


基础差距极大的国家,不太可能有真正平等的“合作”;
你别说,这样也好,省得在技术细节上扯皮(印度没有扯这种高级皮的资格),只需要专心在进度、开支上打嘴仗就行;
中国和俄罗斯联合研制,肯定闹崩--因为技术和需求原因:

印度的飞机项目,真是一片混乱,搞不清自己到底想要啥。

基础差距极大的国家,不太可能有真正平等的“合作”;
你别说,这样也好,省得在技术细节上扯皮(印度没有扯这种高级皮的资格),只需要专心在进度、开支上打嘴仗就行;
中国和俄罗斯联合研制,肯定闹崩--因为技术和需求原因:

印度的飞机项目,真是一片混乱,搞不清自己到底想要啥。
yigua 发表于 2011-10-7 09:05
FAFG是T-50发展型吗?还是另起炉灶?
不算另起炉灶, 基于T-50的发展型。
绿林奸汉 发表于 2011-10-7 09:46
基础差距极大的国家,不太可能有真正平等的“合作”;
你别说,这样也好,省得在技术细节上扯皮(印度没有 ...
手把手教还是可以滴。

LCA打下的基础加上五代机的整机设计训练。  总比买整机要强。
LCA这基础打得还真“牢固”啊,也不知道有多少是毛子帮打的
avaion 发表于 2011-10-7 09:44
宣委还把毛子的话当真的,这要多么善良纯洁的人才如此相信毛子啊
这年头很难得啊
是得 毛子在其他方面还真没有多少吸引力 现在除了三哥和毛子做了一定的捆绑外,其他现在谁还鸟毛子。。
th945 发表于 2011-10-7 10:32
是得 毛子在其他方面还真没有多少吸引力 现在除了三哥和毛子做了一定的捆绑外,其他现在谁还鸟毛子。。
毛宣委就很相信嘛
当初在争论瓦舰跟三哥的航母那个快的时候,有人就信了毛子的进度表
o(︶︿︶)o 唉

时间果然是证明一切的法宝之一啊。
计划归计划,现实归现实
DPEinC=PE 发表于 2011-10-7 10:03
手把手教还是可以滴。

LCA打下的基础加上五代机的整机设计训练。  总比买整机要强。
没仔细看完,具体那20个系列培训啥没说吧,更没说是手把手教阿三设计吧.  
avaion 发表于 2011-10-7 10:42
毛宣委就很相信嘛
当初在争论瓦舰跟三哥的航母那个快的时候,有人就信了毛子的进度表
o(︶︿︶)o 唉
是得 兔子一直在做了在说,现在毛子学了三哥 现把牛皮吹上天,以后的事情就不知道了,最好的例子就是普大帝的6艘航母计划,那个时候听出来好响亮呀,当时兔子还在论证航母中。。可是现在兔子老瓦都改装完成了,他得航母完全没有影子 到是毛子看到兔子改装老瓦 动了心准备像老瓦怎么改 问题是毛子没有钱呀,到现在也没有看到大修后很大变化的裤子。。
毛子还得先培训?这钱也不好赚啊
第二阶段设计合同将于2012年9月前定案。
合同二字大亮啊,坐等fgfa的c转s。
当年俄罗斯拉俺国一起联合研制伊尔-76MF,俺国认为俄国人已经把事情做的差不多了,所以没有做。
还是决定自行研制自己的大运。虽然飞机出来的慢点,但是一旦出来,是前者所不能比的。
好害怕哦
估计阿三第N代机都会与毛子合作
先把mig21造出来再谈其他的吧
小飞猪 发表于 2011-10-7 15:12
当年俄罗斯拉俺国一起联合研制伊尔-76MF,俺国认为俄国人已经把事情做的差不多了,所以没有做。
还是决定自 ...
是得 毛子这么做就是A钱钱 骗小钱钱。。。
三哥的设计师先由毛子培训,再和毛子合作设计
印度今早上在拉贾斯坦邦又摔了架MIG-21
w w w.rediff.com/news/report/mig-21-crashes-in-rajasthan-pilot-ejects-safely/20111007.htm
GLA41904 发表于 2011-10-7 23:16
印度今早上在拉贾斯坦邦又摔了架MIG-21
w w w.rediff.com/news/report/mig-21-crashes-in-rajasthan-pilot ...
这个是今年第几架了?
转个笑话,原创是超大的某网友,id忘记了

甲:我给你讲个笑话吧?
乙:你确定?我笑点很高的哦!
甲:阿三……
乙:哈哈哈哈哈哈哈哈哈哈哈哈哈~~~~
涡轮 发表于 2011-10-7 14:35
毛子还得先培训?这钱也不好赚啊
HAL的人, 估计是。
神一般的hal,寡妇制造者。
阿三还想两条腿走路,mca不搞了,直接上重歼,指标全面对抗四妹
奇多圈 发表于 2011-10-8 08:53
阿三还想两条腿走路,mca不搞了,直接上重歼,指标全面对抗四妹
貌似MCA也搞。
DPEinC=PE 发表于 2011-10-8 08:22
HAL的人, 估计是。
HAL还是去求助于湿婆神吧
DPEinC=PE 发表于 2011-10-8 09:31
貌似MCA也搞。
MCA三哥自己能搞了?
涡轮 发表于 2011-10-8 10:06
MCA三哥自己能搞了?
正在和北边的传统盟友交流。


这不培训了一批了。