戈尔什科夫改装--除了部分外壳外, 全改装过了

来源:百度文库 编辑:超级军网 时间:2024/05/02 06:24:01


=================================================

http://www.arms-tass.su/?page=article&aid=80226&cid=24


戈尔什科夫改装--准备就时间和成本具体问题签署附属补充合约,定于2012年交付


--除了部分外壳外, 全改装过了


这样的工程,从某种程度上来说, 并不亚于建造一艘新的航母, 甚至难度更要大些。



改装过的航母: The head of Rosoboronexport recalled that work on the "Admiral Gorshkov" is very complicated. Since the "take only body aircraft carrier, and complete " stuffing "will be new, most advanced, it practically means to build a new ship







Russia and India are preparing addition to the contract for the construction of aircraft carrier "Admiral Gorshkov"

  
MANAMA (Bahrain), January 21. (ITAR-TASS). Russia and India are currently engaged in work on a supplement to the contract for the construction of aircraft carrier Admiral Gorshkov. According to ITAR-TASS the head of Rosoboronexport, Anatoly Isaikin, this document will be recorded in time and cost of works. However, he declined to predict when the document is signed.

"The negotiations are completed, a mutually acceptable solution for Russia and India. At the same time costs have risen, but the time of production is not increased," - said Isaikin. He said that now those arrangements should be recorded in an addendum to the contract.

The head of Rosoboronexport recalled that work on the "Admiral Gorshkov" is very complicated. Since the "take only body aircraft carrier, and completely" stuffing "will be new, most advanced, it practically means to build a new ship."

"There was a delay in the negotiations at a cost that has increased", - said the head of state corporations. Thus "Sevmash in Severodvinsk continued to build an aircraft carrier. "Now the problem of dropped in value, the ship will be completed on schedule", - assured Isaikin. Previously, experts reported that the ship will be ready in 2012



==============================================


Россия и Индия готовят дополнение к контракту на строительство авианосца "Адмирал Горшков"


МАНАМА (Бахрейн), 21 января. (ИТАР-ТАСС). Россия и Индия в настоящее время ведут работу над дополнением к контракту по постройке авианосца "Адмирал Горшков". Как сообщил корр.ИТАР-ТАСС глава "Рособоронэкспорта" Анатолий Исайкин, в этом документе будут зафиксированы сроки и стоимость работ. Однако он отказался прогнозировать, когда документ будет подписан.

"Переговоры завершены, найдено взаимоприемлемое решение для России и Индии. При этом возросла стоимость, но сроки изготовления не увеличены", - сказал Исайкин. Он уточнил, что теперь данные договоренности должны быть зафиксированы в дополнении к контракту.

Глава "Рособоронэкспорта" напомнил, что работы по "Адмиралу Горшкову" весьма сложные. Поскольку "взят только корпус авианосца, а полностью "начинка" будет новой, самой совершенной, это практически означает построить новый корабль".

"Была задержка на переговорах по стоимости, которая возросла", - отметил руководитель госкорпорации. При этом "Севмаш" в Северодвинске продолжал строить авианосец. "Сейчас проблемы сняты по стоимости, корабль будет достроен по графику", - заверил Исайкин. Ранее эксперты сообщали, что корабль будет готов в 2012 г.

=================================================

http://www.arms-tass.su/?page=article&aid=80226&cid=24


戈尔什科夫改装--准备就时间和成本具体问题签署附属补充合约,定于2012年交付


--除了部分外壳外, 全改装过了


这样的工程,从某种程度上来说, 并不亚于建造一艘新的航母, 甚至难度更要大些。



改装过的航母: The head of Rosoboronexport recalled that work on the "Admiral Gorshkov" is very complicated. Since the "take only body aircraft carrier, and complete " stuffing "will be new, most advanced, it practically means to build a new ship







Russia and India are preparing addition to the contract for the construction of aircraft carrier "Admiral Gorshkov"

  
MANAMA (Bahrain), January 21. (ITAR-TASS). Russia and India are currently engaged in work on a supplement to the contract for the construction of aircraft carrier Admiral Gorshkov. According to ITAR-TASS the head of Rosoboronexport, Anatoly Isaikin, this document will be recorded in time and cost of works. However, he declined to predict when the document is signed.

"The negotiations are completed, a mutually acceptable solution for Russia and India. At the same time costs have risen, but the time of production is not increased," - said Isaikin. He said that now those arrangements should be recorded in an addendum to the contract.

The head of Rosoboronexport recalled that work on the "Admiral Gorshkov" is very complicated. Since the "take only body aircraft carrier, and completely" stuffing "will be new, most advanced, it practically means to build a new ship."

"There was a delay in the negotiations at a cost that has increased", - said the head of state corporations. Thus "Sevmash in Severodvinsk continued to build an aircraft carrier. "Now the problem of dropped in value, the ship will be completed on schedule", - assured Isaikin. Previously, experts reported that the ship will be ready in 2012



==============================================


Россия и Индия готовят дополнение к контракту на строительство авианосца "Адмирал Горшков"


МАНАМА (Бахрейн), 21 января. (ИТАР-ТАСС). Россия и Индия в настоящее время ведут работу над дополнением к контракту по постройке авианосца "Адмирал Горшков". Как сообщил корр.ИТАР-ТАСС глава "Рособоронэкспорта" Анатолий Исайкин, в этом документе будут зафиксированы сроки и стоимость работ. Однако он отказался прогнозировать, когда документ будет подписан.

"Переговоры завершены, найдено взаимоприемлемое решение для России и Индии. При этом возросла стоимость, но сроки изготовления не увеличены", - сказал Исайкин. Он уточнил, что теперь данные договоренности должны быть зафиксированы в дополнении к контракту.

Глава "Рособоронэкспорта" напомнил, что работы по "Адмиралу Горшкову" весьма сложные. Поскольку "взят только корпус авианосца, а полностью "начинка" будет новой, самой совершенной, это практически означает построить новый корабль".

"Была задержка на переговорах по стоимости, которая возросла", - отметил руководитель госкорпорации. При этом "Севмаш" в Северодвинске продолжал строить авианосец. "Сейчас проблемы сняты по стоимости, корабль будет достроен по графику", - заверил Исайкин. Ранее эксперты сообщали, что корабль будет готов в 2012 г.
毛文啊。这个看不懂啊。
有人愿意出钱那就好,只是改造就被宰成这样,难怪三哥发奋要自制航母呢
感觉上俄毛都不用自己掏钱搞军备了,三哥一家就掏钱办了两家的事。
如果改装工程没有豆腐渣的话,这船比现状态的裤子好使
这么说进度很快就要好了?
这个船厂拿元帅练手,回头就能改裤子了, 新造也会了
zlatan 发表于 2010-1-22 00:30
    一定是这样的,这几年毛子每比生意都是这样内容
你们都这样说,怎么感觉三哥就是一杯具人物啊?!
毛子就是借鸡下蛋。
毛子真实在
攒点经验值,过几年裤子改造的时候用的上。老毛子办事,鬼精。
印度人出钱,毛子攒经验
小样的,穿个马甲就认不出来了啊~~
2012里的航母事阿三的。。。
价格和尼米兹差不多了。。。
JSTCVW09CD 发表于 2010-1-22 00:01

这话毛子意思是A3阿,这改造难度太高,比新造都贵,所以嘛现在这价钱你等于白拣阿,

3哥说了,是阿是阿太便宜了。
重庆人 发表于 2010-1-22 02:00

三哥是洗具人物:D
我们的老W和老哥谁先完成呢?
三哥整个就是一茶几,而且是实木的
sanguoyouqian
只要有三哥这个凯子在,一切皆有可能啊...{:shui:}
耶稣的孩子 发表于 2010-1-22 03:24


    是的。。估计毛子给三哥改装法可以和老瓦改装可能是异曲同工之处。。。
回复 1# JSTCVW09CD


    老J,怎么没图呀。
   能搜落点戈尔什科夫最近的图片吗?
谁叫当年大型航母的制造基地在黑海呢。如果在北德文斯克。或者列宁格勒也有一个能造8万吨左右的船厂有航母建造能力,会是现在这个样子吗。
阿三杯具~ 还是纯的!
毛子拿三哥练手
这不会是为了继续加价而事先放风吧:L
杯具
被忽悠的太惨了.这价格给西班牙能搞出多大一条船啊.
看那舰岛那样子就不是起降固定巽飞机的料。。。。
主机位置就在那里了,改不了了
tu26160 发表于 2010-1-22 14:58

海军上将造船厂有造8万吨舰艇的制造能力。
除了部份外壳,全都改装过...
这算是先进?还是在形容戈尔什科夫的悲剧?
从航空巡洋舰改成艘航母...二十多个亿...
造艘新的多少钱?

还有毛子自家那艘库子涅佐夫,没什么可改头.
毛子心理肯定还是惦记着新航母,能不能造出来另当别论.
大家都是标榜美国那样的,现在倒是值得期待,是我们先造出来,还是毛子先造出来...
这样搞还不如新造啊.
回复 35# jackfee
新造?当时各方案,就属毛子的11430最靠谱最现实最容易实现,现在也是。
几首航母买回来都测绘个遍了吧。 设计, 和海尔拆西门子,LG,三星的洗衣机, 冰箱有什么区别?
所以需要很多很多钱啦
polelite 发表于 2010-1-22 17:08

记得以前修车的时候,问师傅怎么才能挣大钱,师傅说:"换,该换的给他换,不该换的创造条件也要换."
"那要是让人家知道了怎么办?"
"你傻啊,自己买的起车的还会在乎这几个修车钱,不让人笑话吗!"
"那要是公家的车呢,这不成了损公肥私啊?"
"那就跟好了,共产党的钱谁不想挣,换的越多,这帮人挣的越多,发动机,波箱什么的,往大的整.大家有钱挣.皆大欢喜啊"
这完全就没考虑成本么···
毛子忽悠啊三,自己增加就业,还能再造航母方面涨经验值。

不过啊三真的没有弄航母的能力,这样算双赢吧