雪花纷飞,朱沃姆特号再次出航

来源:百度文库 编辑:超级军网 时间:2024/04/29 06:14:35




朱沃姆特号在3月21日再度离开BIW船厂,从 Kennebec River入海展开新一阶段试航。这是第二次,也是最后一次厂方试航,之后就要交给海军检验。

http://www.staradvertiser.com/br ... -to-sea-for-trials/

March 21, 2016

The USS Zumwalt, the Navy’s new guided-missile destroyer, made it way down the Kennebec River as it headed out to sea, today, in Bath, Maine. The new destroyer, which was built at Bath Iron Works, will undergo final builder trials before the ship is presented to the Navy for inspection.


BATH, Maine » The nation’s largest and most expensive destroyer headed out to sea today for final builder trials before being presented to the Navy for inspection.

这次试航中BIW的工程师会仔细检验推进系统、机动力、安全性,在交给军方检测前确保一切尽量完美

Engineers and technicians at Bath Iron Works are going to focus on propulsion, mobility and safety aboard the future USS Zumwalt to ensure everything is shipshape before the next trials, in which the Navy will perform a pre-delivery inspection.

Rear Adm. Peter Fanta, director of surface warfare, said he likes what he has heard from the ship’s commanding officer during the first trials in December.

Peter Fanta少将表示,朱沃姆特号的稳定性能让人惊艳,特别是海上自持能力。

“He was extremely impressed with the stability of the ship, particularly in hard turns, particularly in its seakeeping ability,” he told The Associated Press.

The 600-foot ship is unlike anything ever built for the Navy. It features an angular shape to deflect enemy radar, a wave-piercing “tumblehome” hull, electric propulsion and new guns. Automation allows it to operate with a smaller crew than existing destroyers.

But those innovations come at a high cost. The Zumwalt, the first of three ships in the class, will cost at least $4.4 billion.

The price ballooned to the point some in the Navy tried to kill the program. Instead, the program originally envisioned for 32 ships was truncated.

The ship, which will be based in San Diego, stands to play a role in the Obama administration’s “rebalance” of resources to Asia and the Pacific, where China is flexing its military muscle in the South China Sea. But Fanta said he’ll want a full assessment of capabilities before determining exactly how the ship will be used.

More than 200 Bath Iron Works employees and Navy personnel are participating in the builder trials with an aim of delivering the ship to the Navy this year.

After that, there will be even more assessments, including rough-weather tests to determine the performance of the unusual hull that gives the ship a pyramid shape.

“We go to find the most miserable places in the ocean and drive at various sea stages,” Fanta said.

The Navy believes it knows how the ship will perform, but it won’t know for sure until all tests are completed, he said.

2015年12月的Alpha试航大致成功,虽然回来之后需要维修船上12个电动马达中的1个。

This will be the second time the ship has gone to sea. The “alpha” trials in December, which gave engineers their first opportunity to test systems at sea, were deemed a success even though repairs were needed on one of the ship’s 12 motor drives.

web1_20160321_brk_zum01.jpg (51.13 KB, 下载次数: 52)

下载附件 保存到相册

2016-3-22 13:34 上传



朱沃姆特号在3月21日再度离开BIW船厂,从 Kennebec River入海展开新一阶段试航。这是第二次,也是最后一次厂方试航,之后就要交给海军检验。

http://www.staradvertiser.com/br ... -to-sea-for-trials/

March 21, 2016

The USS Zumwalt, the Navy’s new guided-missile destroyer, made it way down the Kennebec River as it headed out to sea, today, in Bath, Maine. The new destroyer, which was built at Bath Iron Works, will undergo final builder trials before the ship is presented to the Navy for inspection.


BATH, Maine » The nation’s largest and most expensive destroyer headed out to sea today for final builder trials before being presented to the Navy for inspection.

这次试航中BIW的工程师会仔细检验推进系统、机动力、安全性,在交给军方检测前确保一切尽量完美

Engineers and technicians at Bath Iron Works are going to focus on propulsion, mobility and safety aboard the future USS Zumwalt to ensure everything is shipshape before the next trials, in which the Navy will perform a pre-delivery inspection.

Rear Adm. Peter Fanta, director of surface warfare, said he likes what he has heard from the ship’s commanding officer during the first trials in December.

Peter Fanta少将表示,朱沃姆特号的稳定性能让人惊艳,特别是海上自持能力。

“He was extremely impressed with the stability of the ship, particularly in hard turns, particularly in its seakeeping ability,” he told The Associated Press.

The 600-foot ship is unlike anything ever built for the Navy. It features an angular shape to deflect enemy radar, a wave-piercing “tumblehome” hull, electric propulsion and new guns. Automation allows it to operate with a smaller crew than existing destroyers.

But those innovations come at a high cost. The Zumwalt, the first of three ships in the class, will cost at least $4.4 billion.

The price ballooned to the point some in the Navy tried to kill the program. Instead, the program originally envisioned for 32 ships was truncated.

The ship, which will be based in San Diego, stands to play a role in the Obama administration’s “rebalance” of resources to Asia and the Pacific, where China is flexing its military muscle in the South China Sea. But Fanta said he’ll want a full assessment of capabilities before determining exactly how the ship will be used.

More than 200 Bath Iron Works employees and Navy personnel are participating in the builder trials with an aim of delivering the ship to the Navy this year.

After that, there will be even more assessments, including rough-weather tests to determine the performance of the unusual hull that gives the ship a pyramid shape.

“We go to find the most miserable places in the ocean and drive at various sea stages,” Fanta said.

The Navy believes it knows how the ship will perform, but it won’t know for sure until all tests are completed, he said.

2015年12月的Alpha试航大致成功,虽然回来之后需要维修船上12个电动马达中的1个。

This will be the second time the ship has gone to sea. The “alpha” trials in December, which gave engineers their first opportunity to test systems at sea, were deemed a success even though repairs were needed on one of the ship’s 12 motor drives.


怎么就是12个电动机呢?这不废话,1.6万吨的玩意自持力再不好那就没天理了

怎么就是12个电动机呢?这不废话,1.6万吨的玩意自持力再不好那就没天理了
换动力动作很快呀
winner0520 发表于 2016-3-22 17:55
换动力动作很快呀
这都多长时间了


突出来的影响隐身能力的卫通天线要去西海岸装











突出来的影响隐身能力的卫通天线要去西海岸装









坑爹的电推修好了?
照片拍得很有感觉,美宣部战斗力V5
临时评论员 发表于 2016-3-22 18:36
坑爹的电推修好了?
不知何时又坏过
拍的真漂亮。
抓紧最后时间吧,马上这平整的外形就没有了
美宣部战斗力就是强啊,很有艺术气息
为什么这照片我觉得好丑
zjjxwyf 发表于 2016-3-22 20:45
为什么这照片我觉得好丑
同觉得丑,这么短的身体,中间鼓起一堆。。。
照片很牛逼!
总觉得这船的前甲板上躺着俩棺材似的。。。
居然塞了两门炮。。拆掉一门换成垂发不是很好么。
1390137573 发表于 2016-3-22 21:22
居然塞了两门炮。。拆掉一门换成垂发不是很好么。
设计师真的认为未来战争是炮战?
谁有美帝海军舰艇高清照片的原始出处(国外)的传送门?
fugui 发表于 2016-3-22 20:52
总觉得这船的前甲板上躺着俩棺材似的。。。
的确像。





绿林奸汉 发表于 2016-3-22 21:44
的确像。
所见略同!!!
有这么冷吗……
这张图拍的不错
照片就是拍的很酷, 特别有那种历史的感觉
不注意看还以为是一段长城
总觉得这船的前甲板上躺着俩棺材似的。。。
确实,好在造型中式,老外不了解。确是不祥之兆,渗得慌,这在中国,设计师得下课。
琅琊小史 发表于 2016-3-22 23:14
确实,好在造型中式,老外不了解。确是不祥之兆,渗得慌,这在中国,设计师得下课。
也许美帝也想升官发财。
出海估计又要机械故障了,然后返港维护
照片不错哦
lonqixia 发表于 2016-3-22 21:33
设计师真的认为未来战争是炮战?
原本是打算上电磁炮的。。电磁炮坑了就只有上155了
风萧萧兮易水寒,战舰一去不复还。
为啥有种台风级的即视感。。。
lonqixia 发表于 2016-3-22 21:33
设计师真的认为未来战争是炮战?
其中一门是计划地磁轨道炮的 一门传统火炮
1390137573 发表于 2016-3-23 07:30
原本是打算上电磁炮的。。电磁炮坑了就只有上155了
155只是暂时的
我还以为是哪个地方的城楼
1771964382 发表于 2016-3-23 11:03
155只是暂时的
然后后续舰没了。。。
这年头舰炮还有意义吗?不如腾出位置来多放点导弹了

琅琊小史 发表于 2016-3-22 23:14
确实,好在造型中式,老外不了解。确是不祥之兆,渗得慌,这在中国,设计师得下课。


这个舰炮造型其实一点都不中式,更像是西方风格的棺材
琅琊小史 发表于 2016-3-22 23:14
确实,好在造型中式,老外不了解。确是不祥之兆,渗得慌,这在中国,设计师得下课。


这个舰炮造型其实一点都不中式,更像是西方风格的棺材
这个舰炮造型其实一点都不中式,更像是西方风格的棺材
以后猪母改名棺材吧,一个不行还整俩。
真 浮动棺材


我指外形
1390137573 发表于 2016-3-22 21:22
居然塞了两门炮。。拆掉一门换成垂发不是很好么。
人家编制里是用来替换战列舰的。
另外垂发没记错的话在侧面,炮可以节约成本