F-35C的着舰勾的改进设计到2013年底或者2014年初才会在舰上测试。

头显正在改进。

夜视系统准备用新的摄像头。

各种航电正在测试中。

F35B的试飞今年的进度比计划快20%。已经飞到49000英尺,1.4马赫,表速每小时630海里,最大过载7G。设计的最大飞行高度是50000英尺,1.6马赫。现在试飞完成了50%的无外挂包线。
F35C同样今年试飞进度比计划快20%。已经飞到45000英尺,1.4马赫,表速每小时630海里,最大过载7.5G。设计的最大表速是每小时700海里(比B高)。现在试飞完成了40%的无外挂包线。
F35A现在试飞完成了45%的无外挂包线。

F35A今年第四季度将完成全寿命试验。到现在为止没有新出现的问题。

各型都已经开始测试武器外挂。今年晚些时候将开始大迎角测试,最终会达到50度。计划也将开始潮湿跑道上的测试,发动机空中点火测试,和武器发射测试。


The F-35 Lightning II is making good progress through flight testing this year, a top Lockheed Martin official says. Most of the biggest challenges faced by the programme should be well on their way to being fixed by the later part of the year.

One major issue that has recently popped up on the US Navy's F-35C variant is that the aircraft's tail-hook has had to be redesigned. That is because the existing design has failed to catch an arresting cable during trials. Lockheed is working on a new improved hook design that should fix the problem.

"We have modified the hook pointwith a lower center of gravity," says Steve O'Bryan, Lockheed's vice president for F-35 programme integration and business development. Additionally, "we've redesigned the hold-down damper."


©Lockheed Martin

The new design is scheduled for its preliminary design review in "the summer." That will be followed by a critical design review in the fourth quarter.

After the new hook design undergoes shore-based qualification trails, the F-35C will undergo sea trials on a carrier in late 2013 or early 2014.

Lockheed is also set to test fixes to the jet's troublesome helmet-mounted display (HMD) this summer, O'Bryan says. Lockheed has reached an agreement with the US government on the HMD requirements, which will help the company to fix imagery lag on the helmet by tweaking the system's software, he says.

The company is also adding micro inertial measurement units (IMU) to the helmet and pilot's seat to dampen out jittery images. "We're going to fly those micro-IMUs this summer," O'Bryan says.

Lockheed hopes that the new ISIE-11 camera, which replaces the existing ISIE-10 cameras, will resolve jet's night vision acuity problems. The new system will undergo testing at MIT's Lincoln Labs later this summer. The system will now consist of two ISIE-11 cameras, one of which will be mounted in the helmet and another on the canopy bow, and imagery pumped in from the F-35's six distributed aperture system (DAS) infrared cameras.

"We're optimistic, we've got a good plan," O'Bryan says.

Meanwhile, the pilots have started to test the imagery from the distributed aperture system. Initial results look to be very promising, O'Bryan says. But there will need to be tweaks as flight tests reveal potential issues.

Other avionics tests are proceeding well. The F-35 has already started testing the Link-16 data-link and will soon start to test the variable message format link which is needed for the close air support mission. There are also ongoing tests with the radar, electronic warfare, and infrared targeting system, which are needed for the release of the Block 2A training software.

On the flight sciences side, the US Marine Corps short take-off vertical landing (STOVL) F-35B test programme is further along than that of the F-35C. The previously troubled B-model is now running 20% ahead of this year's planned test schedule, O'Bryan says.

The F-35B has flown at altitudes over 49,000ft and has hits speeds of Mach 1.4. That's just shy of the F-35's required 50, 000 ft ceiling and Mach 1.6 design speed limit, he says. The B-model has also flown at its maximum airspeed of 630 knots and has achieved its maximum 7G limit.

"It's about over 50% complete with its clean-wing full-envelop test points," O'Byan says.


©Lockheed Martin

The F-35C is also about 20% ahead of this year's flight test plan, O'Bryan says. Like the F-35B, the C-model has flown out to 630 knots, but the naval variant is required to hit 700 knots. The C-model has also flown at 45, 000 ft and at speeds of Mach 1.4. It has also hit its maximum 7.5G limit.

That means the USN version has completed about 40% of its clean configuration flight envelope test points, O'Bryan says.

Out at Edwards AFB, California, F-35A will have completed 45% of the totality of its flight test points by the end of the year. By the fourth quarter, the F-35A should have competed its first full lifetime of durability testing, O'Bryan says. There have thus far been no new issues that have arisen as a result of the tests.

'That, I'm happy to say, is going well," he says.

The all versions of the jet have started flying with external stores. Later this year, the aircraft will enter into high angle of attack testing, which will ultimate hit 50angle of attack, O'Bryan says. The programme will also start wet runway tests, engine air starts, and weapons releases.
原文

要点:
F-35C的着舰勾的改进设计到2013年底或者2014年初才会在舰上测试。

头显正在改进。

夜视系统准备用新的摄像头。

各种航电正在测试中。

F35B的试飞今年的进度比计划快20%。已经飞到49000英尺,1.4马赫,表速每小时630海里,最大过载7G。设计的最大飞行高度是50000英尺,1.6马赫。现在试飞完成了50%的无外挂包线。
F35C同样今年试飞进度比计划快20%。已经飞到45000英尺,1.4马赫,表速每小时630海里,最大过载7.5G。设计的最大表速是每小时700海里(比B高)。现在试飞完成了40%的无外挂包线。
F35A现在试飞完成了45%的无外挂包线。

F35A今年第四季度将完成全寿命试验。到现在为止没有新出现的问题。

各型都已经开始测试武器外挂。今年晚些时候将开始大迎角测试,最终会达到50度。计划也将开始潮湿跑道上的测试,发动机空中点火测试,和武器发射测试。


The F-35 Lightning II is making good progress through flight testing this year, a top Lockheed Martin official says. Most of the biggest challenges faced by the programme should be well on their way to being fixed by the later part of the year.

One major issue that has recently popped up on the US Navy's F-35C variant is that the aircraft's tail-hook has had to be redesigned. That is because the existing design has failed to catch an arresting cable during trials. Lockheed is working on a new improved hook design that should fix the problem.

"We have modified the hook pointwith a lower center of gravity," says Steve O'Bryan, Lockheed's vice president for F-35 programme integration and business development. Additionally, "we've redesigned the hold-down damper."


©Lockheed Martin

The new design is scheduled for its preliminary design review in "the summer." That will be followed by a critical design review in the fourth quarter.

After the new hook design undergoes shore-based qualification trails, the F-35C will undergo sea trials on a carrier in late 2013 or early 2014.

Lockheed is also set to test fixes to the jet's troublesome helmet-mounted display (HMD) this summer, O'Bryan says. Lockheed has reached an agreement with the US government on the HMD requirements, which will help the company to fix imagery lag on the helmet by tweaking the system's software, he says.

The company is also adding micro inertial measurement units (IMU) to the helmet and pilot's seat to dampen out jittery images. "We're going to fly those micro-IMUs this summer," O'Bryan says.

Lockheed hopes that the new ISIE-11 camera, which replaces the existing ISIE-10 cameras, will resolve jet's night vision acuity problems. The new system will undergo testing at MIT's Lincoln Labs later this summer. The system will now consist of two ISIE-11 cameras, one of which will be mounted in the helmet and another on the canopy bow, and imagery pumped in from the F-35's six distributed aperture system (DAS) infrared cameras.

"We're optimistic, we've got a good plan," O'Bryan says.

Meanwhile, the pilots have started to test the imagery from the distributed aperture system. Initial results look to be very promising, O'Bryan says. But there will need to be tweaks as flight tests reveal potential issues.

Other avionics tests are proceeding well. The F-35 has already started testing the Link-16 data-link and will soon start to test the variable message format link which is needed for the close air support mission. There are also ongoing tests with the radar, electronic warfare, and infrared targeting system, which are needed for the release of the Block 2A training software.

On the flight sciences side, the US Marine Corps short take-off vertical landing (STOVL) F-35B test programme is further along than that of the F-35C. The previously troubled B-model is now running 20% ahead of this year's planned test schedule, O'Bryan says.

The F-35B has flown at altitudes over 49,000ft and has hits speeds of Mach 1.4. That's just shy of the F-35's required 50, 000 ft ceiling and Mach 1.6 design speed limit, he says. The B-model has also flown at its maximum airspeed of 630 knots and has achieved its maximum 7G limit.

"It's about over 50% complete with its clean-wing full-envelop test points," O'Byan says.


©Lockheed Martin

The F-35C is also about 20% ahead of this year's flight test plan, O'Bryan says. Like the F-35B, the C-model has flown out to 630 knots, but the naval variant is required to hit 700 knots. The C-model has also flown at 45, 000 ft and at speeds of Mach 1.4. It has also hit its maximum 7.5G limit.

That means the USN version has completed about 40% of its clean configuration flight envelope test points, O'Bryan says.

Out at Edwards AFB, California, F-35A will have completed 45% of the totality of its flight test points by the end of the year. By the fourth quarter, the F-35A should have competed its first full lifetime of durability testing, O'Bryan says. There have thus far been no new issues that have arisen as a result of the tests.

'That, I'm happy to say, is going well," he says.

The all versions of the jet have started flying with external stores. Later this year, the aircraft will enter into high angle of attack testing, which will ultimate hit 50angle of attack, O'Bryan says. The programme will also start wet runway tests, engine air starts, and weapons releases.
F-35A will have completed 45% of the totality of its flight test points by the end of the year.

f35A今年预计要完成所有试飞节点的45%,呵呵
costrave 发表于 2012-5-23 08:31
F-35A will have completed 45% of the totality of its flight test points by the end of the year.

...
根据上下文,这里应该是指空挂载(clean configuration)。
johnqh 发表于 2012-5-23 08:33
根据上下文,这里应该是指空挂载(clean configuration)。
根据上文。
The F-35B has flown at altitudes over 49,000ft and has hits speeds of Mach 1.4. That's just shy of the F-35's required 50, 000 ft ceiling and Mach 1.6 design speed limit, he says. The B-model has also flown at its maximum airspeed of 630 knots and has achieved its maximum 7G limit.

"It's about over 50% complete with its clean-wing full-envelop test points," O'Byan says.

f35b现在就已经完成无挂载试飞的50%,难道f35a会更落后?
   另外f35b的设计最大表速630节已经达到了,f35c也飞到了630节,不过35c的最大设计表速是700节,不知道f35a是多少?
根据上文。
The F-35B has flown at altitudes over 49,000ft and has hits speeds of Mach 1.4. That's ...
因为A的包线更大。比如过载9G,C是7.5G,B是7G
啥时候上武器
啥时候上武器
武器硬件方面在地面测试过,软件需要2B版本。
看来A和B的气动和结构设计上问题不大了,所以进度提升了。C的尾钩比较麻烦,就看今后试验结果了。

从F-35本身的设计难点来看,一个是机体,一个是整合的航电与网络战系统。

在机体方面,由于整合了三种不同需求在一个机体上,难度实际上挺大。可以说在2012年以前,有相当多的时间和精力耗费在机体上,包括超重、B型进度、C型着舰尾钩等。目前看A和B的机体结构上的大多数问题可能已经解决,就差C的尾钩了。不过也不排除未来还会出问题,毕竟三种机型要求差异较大,未来可能为了解决问题而使得机体的通用性进一步降低。

在整合航电和网络战系统方面,从软件规模和目前头盔显示系统的进展来看,估计还需要一段时间折腾。不过这个东西是可升级的,就看这种边生产、边测试的东西进展如何。从形成战斗力上来讲可能初期可能没有一些人想象的那么科幻,要达到未来理想的作战环境,估计还需要一点时间。

整体来说,F-35实际上的技术跨度并不像JSF开始时那样小,所以整体进度是落后初始的JSF的规划的,今天的进度加快在某种程度上其实是在补课。

对于我们而言,F-35的进度加快不是什么好事情,因为F-35会进驻冲绳普天间。很多东西要防患于未然,老美现在极力从伊拉克和阿富汗脱身,等他们从阿富汗脱身后对我们而言就是个不利的事情。希望J-20的进度能够更理想更快一些,然后配套的系统更快成熟,如果能够在2018年完成试飞,将会极大的抵消F-35的部分威胁。如果大运也在2018年试飞完毕,在2020年左右优先发展预警机,那么我们在2020年前后配合几十架J-20和预警机群,就可以确保第一岛链的空中优势,或者说在第一岛链不会被F-22和F-35随意来往。希望我们的进度比较理想。
johnqh 发表于 2012-5-23 08:33
根据上下文,这里应该是指空挂载(clean configuration)。

你再仔细看看原文,应该不是指控挂载,“Out at Edwards AFB……”是一句转折,“45% of the totality of its flight test points ”也说得很清楚了。

F-35C空挂载包线都已达到40%,要知道F-35C目前只有3架试飞机,还要进行航母科目的试飞;而A型有6架,并且总体试飞进度比C型领先2年左右。

韩五记 发表于 2012-5-23 09:40
你再仔细看看原文,应该不是指控挂载,“Out at Edwards AFB……”是一句转折,“45% of the totality  ...


还没有带外挂飞呢。这个"flight test points"定义是什么呢?
韩五记 发表于 2012-5-23 09:40
你再仔细看看原文,应该不是指控挂载,“Out at Edwards AFB……”是一句转折,“45% of the totality  ...


还没有带外挂飞呢。这个"flight test points"定义是什么呢?
今年5月8号的新闻:https://www.f35.com/news-events/news-releases.aspx

“During the time period, the SDD fleet surpassed the 15,000 total test point threshold, completing approximately 25 percent of the SDD program's entire requirement of more than 59,000 test points.”

整个SDD阶段25%的测试点已经完成,考虑到C型落后的进度,A型在年末达到45%是很有可能的。
2012-5-23 09:48 上传



“flight test points”当然是指所有的试飞测试点,每次test report都是用的这个词
“flight test points”当然是指所有的试飞测试点,每次test report都是用的这个词
我前面说错了。意思是还没有武器投放试验呢。

那么SDD不包括武器投放吧?但是包括无挂载和有挂载?如果包括有挂载但不包括投放,那么整个的45%还是有可能的。
带这么多外挂,肥电那么重,玩的转吗?
johnqh 发表于 2012-5-23 09:54
我前面说错了。意思是还没有武器投放试验呢。

那么SDD不包括武器投放吧?但是包括无挂载和有挂载?如果 ...
包括啊。武器投放试验今年内就要开始。
包括啊。武器投放试验今年内就要开始。
那感觉如果真是全部测试点的45%,那么进度是相当快了。
johnqh 发表于 2012-5-23 10:01
那感觉如果真是全部测试点的45%,那么进度是相当快了。
试飞从2006年12月开始,到2019年2月结束;12年的时间,现在已经过去6年了,45%不奇怪。

试飞先慢后快是必然规律。
试飞从2006年12月开始,到2019年2月结束;12年的时间,现在已经过去6年了,45%不奇怪。

试飞先慢后快是 ...
被你说服了。
尼玛,到现在还一架没摔。技术还是过关

johnqh 发表于 2012-5-23 08:52
因为A的包线更大。比如过载9G,C是7.5G,B是7G


根据zwz的文章,f35的aa1早就飞出了9g过载。并且还以这个为基础估算了f35的机动性能呢个。
johnqh 发表于 2012-5-23 08:52
因为A的包线更大。比如过载9G,C是7.5G,B是7G


根据zwz的文章,f35的aa1早就飞出了9g过载。并且还以这个为基础估算了f35的机动性能呢个。
C型好像最麻烦哦,呵呵
根据zwz的文章,f35的aa1早就飞出了9g过载。并且还以这个为基础估算了f35的机动性能呢个。
刚查了一下,肥电A飞过9.9G了。
期待第一摔
yu197822 发表于 2012-5-23 09:54
带这么多外挂,肥电那么重,玩的转吗?
MD一台f135比阵风两台发动机的推力都大
看来三军通用的战斗机还是不靠谱,单独设计估计早就完成了。
北极星 发表于 2012-5-25 16:29
看来三军通用的战斗机还是不靠谱,单独设计估计早就完成了。
术业有专攻
9.9的过载是不是太夸张了,人受得了吗?
速度有点慢。
MD根本不需要F35,奥巴马谈若与某国开战,打电话重申“奥六条”即可完胜:
1、公布官员海外存款并冻结;
2、公布有美国护照的官员名单;
3、公布在美国定居的高官家属名单;
4、在洛杉矶二奶村旁建核电站;
5、把在美官员家属送往关塔那摩基地;
6、空投单兵武器给的下岗工人、失业学生、城市贫民、失地农民、股民和房奴
55300163 发表于 2012-5-25 18:16
MD根本不需要F35,奥巴马谈若与某国开战,打电话重申“奥六条”即可完胜:
1、公布官员海外存款并冻结;
...
白公馆智囊团的 ?
55300163 发表于 2012-5-25 18:16
MD根本不需要F35,奥巴马谈若与某国开战,打电话重申“奥六条”即可完胜:
1、公布官员海外存款并冻结;
...
MD根本不需要F35,奥巴马谈若与某国开战,打电话重申“奥六条”即可完胜:
1、公布官员海外存款并冻结;
2、公布有美国护照的官员名单;
3、公布在美国定居的高官家属名单;
4、在洛杉矶二奶村旁建核电站;
5、把在美官员家属送往关塔那摩基地;
6、空投单兵武器给的下岗工人、失业学生、城市贫民、失地农民、股民和房奴

-------------
30楼你真够狠的,至搞兔子命根子呀;P
wangyuewo56 发表于 2012-5-25 22:33
MD根本不需要F35,奥巴马谈若与某国开战,打电话重申“奥六条”即可完胜:
1、公布官员海外存款并冻结; ...
任意一条就足够了!
TSQ 发表于 2012-5-23 09:14
看来A和B的气动和结构设计上问题不大了,所以进度提升了。C的尾钩比较麻烦,就看今后试验结果了。

从F-3 ...
如果能够在2018年完成试飞,将会极大的抵消F-35的部分威胁
------------------------------------------------------------------
对那个J20不要太乐观,毕竟天朝的技术底子与美国相比太弱了。
yu197822 发表于 2012-5-23 09:54
带这么多外挂,肥电那么重,玩的转吗?
F35的发动机推力强悍啊。
北极星 发表于 2012-5-25 16:29
看来三军通用的战斗机还是不靠谱,单独设计估计早就完成了。
三军通用的战斗机所带来的好处也是相当明显的。
55300163 发表于 2012-5-25 18:16
MD根本不需要F35,奥巴马谈若与某国开战,打电话重申“奥六条”即可完胜:
1、公布官员海外存款并冻结;
...
老大,这个、这个比核生化还牛比
55300163 发表于 2012-5-25 18:16
MD根本不需要F35,奥巴马谈若与某国开战,打电话重申“奥六条”即可完胜:
1、公布官员海外存款并冻结;
...
这六招太损
55300163 发表于 2012-5-25 18:16
MD根本不需要F35,奥巴马谈若与某国开战,打电话重申“奥六条”即可完胜:
1、公布官员海外存款并冻结;
...
土共穴位很多。
摔一下至少停半年吧?