F9抱上金大腿了,安塔瑞斯还要等多久?

来源:百度文库 编辑:超级军网 时间:2024/04/27 17:38:26


SpaceX moves closer to Air Force launches
Hawthorne-based rocket company SpaceX was a big step closer to competing for lucrative U.S. Air Force launches after the military branch’s review of one of the company’s launches.

The Space and Missile Systems Center, the Air Force’s El Segundo-based purchasing arm for rocket launches, said late Tuesday that a SpaceX launch of a Falcon 9 v1.1 on Sept. 29 of last year will count toward the company’s certification to carry Air Force payloads.

The company officially known as Space Exploration Technologies Corp. must perform at least three successful flights of a common launch vehicle as part of the certification process.

SpaceX must also pass a number of technical reviews, audits and independent verification, as well as validation of the rocket’s ground systems and manufacturing processes, the Air Force said.

As part of the certification process, the SMC is also assessing two other SpaceX launches, on Dec. 3 of last year and Jan. 6 of this year.

— Muhammed El-Hasan


OSC与军方关系更亲密,安塔瑞斯更是德尔塔2的完美替代者,8000美元的价格相比德尔塔2都算良心……


SpaceX moves closer to Air Force launches
Hawthorne-based rocket company SpaceX was a big step closer to competing for lucrative U.S. Air Force launches after the military branch’s review of one of the company’s launches.

The Space and Missile Systems Center, the Air Force’s El Segundo-based purchasing arm for rocket launches, said late Tuesday that a SpaceX launch of a Falcon 9 v1.1 on Sept. 29 of last year will count toward the company’s certification to carry Air Force payloads.

The company officially known as Space Exploration Technologies Corp. must perform at least three successful flights of a common launch vehicle as part of the certification process.

SpaceX must also pass a number of technical reviews, audits and independent verification, as well as validation of the rocket’s ground systems and manufacturing processes, the Air Force said.

As part of the certification process, the SMC is also assessing two other SpaceX launches, on Dec. 3 of last year and Jan. 6 of this year.

— Muhammed El-Hasan


OSC与军方关系更亲密,安塔瑞斯更是德尔塔2的完美替代者,8000美元的价格相比德尔塔2都算良心……
安塔瑞斯这么便宜了?
OSC的主要业务还是在于载荷
大家都掺一脚就是大家都没得玩
OSC的主要业务还是在于载荷
大家都掺一脚就是大家都没得玩
OSC的金牛座和飞马座一直在做军方生意,安塔瑞斯不可能止步于NASA的商业轨道补给。毕竟ISS在24年就要退役。
然后现在无论USAF还是NASA,都缺乏一种5吨级LEO的运载火箭。德尔塔2还剩2发,退役不远,安塔瑞斯恰好弥补空缺。
不得不说,这是美地要发射外包的节奏呀.TB也要扶持几个这样的企业
不得不说,这是美地要发射外包的节奏呀.TB也要扶持几个这样的企业
本来就是外包,第一个也是现在唯一的承包商就是波音和洛马合资的ULA,也就是航天发射联盟。几乎美国所有的航天发射都是他们负责的。

楠宫萧vn 发表于 2014-3-2 15:10
OSC的金牛座和飞马座一直在做军方生意,安塔瑞斯不可能止步于NASA的商业轨道补给。毕竟ISS在24年就要退役 ...


leo5吨报价8千万,比起leo13吨报价6千万,差的不只一点点。

5吨载荷,不如搭顺风车,3千万都不要。
楠宫萧vn 发表于 2014-3-2 15:10
OSC的金牛座和飞马座一直在做军方生意,安塔瑞斯不可能止步于NASA的商业轨道补给。毕竟ISS在24年就要退役 ...


leo5吨报价8千万,比起leo13吨报价6千万,差的不只一点点。

5吨载荷,不如搭顺风车,3千万都不要。
leo5吨报价8千万,比起leo13吨报价6千万,差的不只一点点。

5吨载荷,不如搭顺风车,3千万都不要。
那比起报价过亿的德尔塔2也算经济了……
leo5吨报价8千万,比起leo13吨报价6千万,差的不只一点点。

5吨载荷,不如搭顺风车,3千万都不要。
还有,美国军方缺过钱?
还有,美国军方缺过钱?
不缺钱也可以省下来用在其它地方。
才发现Antares的上面级居然是一台ATK Castor 30系列的固体火箭发动机
才发现Antares的上面级居然是一台ATK Castor 30系列的固体火箭发动机
乌克兰只能在你有发动机来源的情况下帮你完成设计……二子级的煤油机毛子出价太高,OSC怂了……
楠宫萧vn 发表于 2014-3-2 20:57
乌克兰只能在你有发动机来源的情况下帮你完成设计……二子级的煤油机毛子出价太高,OSC怂了……
不过ATK Castor 30B的参数很不错啊,比冲都达到300s级别了。

失落的天堂 发表于 2014-3-2 21:06
不过ATK Castor 30B的参数很不错啊,比冲都达到300s级别了。


RD0124可以达到360-_-||
你认为OSC愿意搞一款推重比破下限的奇葩?
失落的天堂 发表于 2014-3-2 21:06
不过ATK Castor 30B的参数很不错啊,比冲都达到300s级别了。


RD0124可以达到360-_-||
你认为OSC愿意搞一款推重比破下限的奇葩?
楠宫萧vn 发表于 2014-3-2 21:13
RD0146可以达到360-_-||
你认为OSC愿意搞一款推重比破下限的奇葩?
RD0146的比冲是460s吧...
固推的比冲当然不能和液推比,而且那还是个氢氧机...
RD0146的比冲是460s吧...
固推的比冲当然不能和液推比,而且那还是个氢氧机...
手抽,RD0124