全新一代发动机-PD-14首台发动机已完成总装并于5月30号 ...

来源:百度文库 编辑:超级军网 时间:2024/04/26 00:14:08

http://en.rian.ru/business/20120605/173864951.html
-

官方消息。

PD-14第一台原型机正式开始测试.......


-
Russia’s G5 Aircraft Engine Starts Testing
-
Russia’s first fifth-generation aircraft engine, PD-14, has been sent assembled and sent for a test program, the manufacturer said on Tuesday.

The PD-14, developed by Aviadvigatel, a Perm-based manufacturer of civil and military aircraft engines, as well as a host of other design bureaus and production associations, is to be installed on the MS-21 passenger jet.
http://en.rian.ru/business/20120605/173864951.html
-

官方消息。

PD-14第一台原型机正式开始测试.......


-
Russia’s G5 Aircraft Engine Starts Testing
-
Russia’s first fifth-generation aircraft engine, PD-14, has been sent assembled and sent for a test program, the manufacturer said on Tuesday.

The PD-14, developed by Aviadvigatel, a Perm-based manufacturer of civil and military aircraft engines, as well as a host of other design bureaus and production associations, is to be installed on the MS-21 passenger jet.
毛子的,哪天如果听到TG的WS-15总装完成开始测试就好了!
真的是,什么时候看到我们的发动机就好了
还真心以为是中国的。
兔子总是藏着掖着
流口水了,我们的快出来
毛子的进度落后我们,据说我们的在2015前装机的
不知道技术指标咋样
大涵道比这一块中俄一样要补课
GCXYJ 发表于 2012-6-10 21:57
毛子的进度落后我们,据说我们的在2015前装机的
咱们出来的达不到它的水平,与其水平相当的要到2020年了。
mcquery 发表于 2012-6-6 11:22
毛子的,哪天如果听到TG的WS-15总装完成开始测试就好了!
这个!!已经开始了。不过是地面测试。
175799024 发表于 2012-6-11 09:35
咱们出来的达不到它的水平,与其水平相当的要到2020年了。
没事,一步步来
毛子现在最好的就是AL41吧?
还是静静的祈祷它早点出来吧
mcquery 发表于 2012-6-6 11:22
毛子的,哪天如果听到TG的WS-15总装完成开始测试就好了!
这个PD14是大涵道比的民用发动机,是用在MS21上和PW1000G互换的,地位类似于TG的CJ1000,所以你这句话应该改成,哪天听到CJ1000总装完成开始测试就好了,至于你所说的15你应该回到几年前去听这个消息。
WS15已经有这个消息了吧